Laserfiche WebLink
establish the standards by which such portion of the <br /> Work will be judged. 47. Unit Price Work—Work to be paid for on <br /> the basis of unit prices. <br /> 39 . Shop Drawings—All drawings, diagrams, <br /> ., illustrations , schedules , and other data or information 48. Work—The entire completed construction <br /> which are specifically prepared or assembled by or for or the various separately identifiable parts thereof re- <br /> CONTRACTOR and submitted by CONTRACTOR to quired to be provided under the Contract Documents. <br /> illustrate some portion of the Work. Work includes and is the result of performing or <br /> ' providing all labor, services, and documentation, <br /> 40. Site—Lands or areas indicated in the necessary to produce such construction , and <br /> Contract Documents as being furnished by OWNER furnishing , installing, and incorporating all materials <br /> r, upon which the Work is to be performed, including and equipment into such construction , all as required <br /> rights-of-way and easements for access thereto, and by the Contract Documents . <br /> such other lands furnished by OWNER which are <br /> AM designated for the use of CONTRACTOR. 49 . Work Change Directive—A written <br /> statement to CONTRACTOR issued on or after the <br /> 41 . Specifications--That part of the Contract Effective Date of the Agreement and signed by <br /> Documents consisting of written technical descriptions OWNER and recommended by ENGINEER ordering <br /> M, of materials, equipment, systems, standards, and an addition , deletion, or revision in the Work, or <br /> workmanship as applied to the Work and certain responding to differing or unforeseen subsurface or <br /> administrative details applicable thereto. physical conditions under which the Work is to be <br /> performed or to emergencies. A Work Change <br /> " 42. Subcontractor—An individual or entity Directive will not change the Contract Price or the <br /> having a direct contract with CONTRACTOR or with Contract Times but is evidence that the parties expect <br /> any other Subcontractor for the performance of a part that the change ordered or documented by a Work <br /> „M of the Work at the Site. Change Directive will be incorporated in a subse- <br /> quently issued Change Order following negotiations by <br /> 43. Substantial Completion—The time at the parties as to its effect, if any, on the Contract Price <br /> which the Work (or a specified part thereof) has or Contract Times. <br /> progressed to the point where, in the opinion of <br /> ENGINEER, the Work (or a specified part thereof) is 50. Written Amendment—A written statement <br /> sufficiently complete, in accordance with the Contract modifying the Contract Documents, signed by <br /> Documents, so that the Work (or a specified part OWNER and CONTRACTOR on or after the Effective <br /> thereof) can be utilized for the purposes for which it is Date of the Agreement and normally dealing with the <br /> intended . The terms "substantially complete" and nonengineering or nontechnical rather than strictly <br /> "substantially completed" as applied to all or part of the construction-related aspects of the Contract Docu- <br /> Work refer to Substantial Completion thereof. ments. <br /> 44. Supplementary Conditions—That part of 1 . 02 Terminology <br /> the Contract Documents which amends or <br /> supplements these General Conditions. A. Intent of Certain Terms or Adjectives <br /> 45. Supplier—A manufacturer, fabricator, 1 . Whenever in the Contract Documents the <br /> supplier, distributor, materialman, or vendor having a terms "as allowed, " "as approved, " or terms of like <br /> direct contract with CONTRACTOR or with any effect or import are used, or the adjectives <br /> Subcontractor to furnish materials or equipment to be 'reasonable," "suitable,° "acceptable, " "proper, " <br /> incorporated in the Work by CONTRACTOR or any "satisfactory," or adjectives of like effect or import <br /> Subcontractor. are used to describe an action or determination of <br /> ENGINEER as to the Work, it is intended that such <br /> 46. Underground Facilities--All underground action or determination will be solely to evaluate, in <br /> pipelines, conduits, ducts, cables, wires, manholes, general, the completed Work for compliance with <br /> vaults, tanks, tunnels, or other such facilities or the requirements of and information in the Contract <br /> attachments, and any encasements containing such Documents and conformance with the design <br /> facilities, including those that convey electricity, gases, concept of the completed Project as a functioning <br /> steam , liquid petroleum products, telephone or other whole as shown or indicated in the Contract <br /> communications, cable television , water, wastewater, Documents (unless there is a specific statement <br /> storm water, other liquids or chemicals, or traffic or indicating otherwise). The use of any such term or <br /> other control systems. adjective shall not be effective to assign to ENGI- <br /> 0209-00700 - General Condificns.doc <br /> Page 7 of 44 <br /> F:IEnBireennglCepital Prajecls=094th Street Brldge Over Cocoh Ditch= th Street Bridge Over Conch 07-20-OM209-00700 - General Conditions.doc <br />