My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-401
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 3:46:22 PM
Creation date
9/30/2015 10:19:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/21/2006
Control Number
2006-401
Agenda Item Number
7.H.
Entity Name
Timothy Rose Contracting, Inc.
Subject
4th. St./Cooch Ditch Bridge/11th. St.SW Paving
Project Number
9321
Archived Roll/Disk#
4008
Supplemental fields
SmeadsoftID
5969
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
791
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEER any duty or authority to supervise or direct E. Unless stated otherwise in the Contract Docu- <br /> the performance of the Work or any duty or ments , words or phrases which have a well-known <br /> authority to undertake responsibility contrary to the technical or construction industry or trade meaning are <br /> provisions of paragraph 9. 10 or any other provision sused in the uch recognized Contract <br /> meaDocuments in accordance with <br /> of the Contract Documents. <br /> B. Day ARTICLE 2 - PRELIMINARY MATTERS <br /> 1 . The word "day" shall constitute a ` <br /> calendar day of 24 hours measured from 2. 01 Delivery of Bonds <br /> midnight to the next midnight <br /> C. Defective A. When CONTRACTOR delivers the executed <br /> Agreements to OWNER, CONTRACTOR shall also <br /> 1 . The word "defective," when modifying deliver to OWNER such Bonds as CONTRACTOR <br /> the word "Work," refers to Work that is may be required to furnish . <br /> unsatisfactory, faulty, or deficient in that it does <br /> not conform to the Contract Documents or does 2.02 Copies of Documents <br /> not meet the requirements of any inspection, <br /> reference standard, test, or approval referred to A. OWNER shall furnish to CONTRACTOR up <br /> in the Contract Documents, or has been to ten copies of the Contract Documents. Additional <br /> damaged prior to ENGINEER's recom- copies will be furnished upon request at the cost of i <br /> mendation of final payment (unless responsi- reproduction. <br /> bility for the protection thereof has been <br /> 2 . 03 Commencement of Contract Times; Notice <br /> assumed by OWNER at Substantial <br /> Completion in accordance with paragraph to Proceed <br /> 14.04 or 14.05). A. The Contract Times will commence to run on <br /> D. Furnish, Install, Perform, Provide the thirtieth day after the Effective Date of the Agree- <br /> ment or, if a Notice to Proceed is given , on the day <br /> 1 . The word "furnish ," when used in indicated in the Notice to Proceed. A Notice to Pro- <br /> connection with services, materials, or ceed may be given at any time within 30 days after the <br /> equipment, shall mean to supply and deliver Effective Date of the Agreement. In no event will the <br /> said services, materials , or equipment to the Contract Times commence to run later than the <br /> Site (or some other specified location) ready for sixtieth day after the day of Bid opening or the thirtieth <br /> use or installation and in usable or operable day after the Effective Date of the Agreement, <br /> condition . whichever date is earlier. <br /> 2 . The word "install , " when used in 2 .04 Starting the Work <br /> connection with services, materials, or <br /> equipment, shall mean to put into use or place A. CONTRACTOR shall start to perform the .r <br /> in final position said services, materials , or Work on the date when the Contract Times com- <br /> equipment complete and ready for intended mence to run. No ork shall be done at the Site prior <br /> o the date on which the Contract Times commence to _ <br /> use. <br /> run. <br /> 3. The words "perform" or "provide," <br /> when used in connection with services, 2 .05 Before Starting Construction ` <br /> materials , or equipment, shall mean to furnish <br /> materials, or A. CNTRACTOR's equipment Ilcomp complete services, <br /> ready for intended men s: Be ore undertaking <br /> CONTRACTOR <br /> part ofview of the Work, <br /> use. CONTRACTOR shall carefully study and compare the <br /> Contract Documents and check and verify pertinent <br /> 4. When "furnish ," "install, " "perform ," or figures therein and all applicable field measurements. <br /> "provide" is not used in connection with services, CONTRACTOR shall promptly report in writing to <br /> materials, or equipment in a context clearly ENGINEER any conflict, error, ambiguity, or <br /> requiring an obligation of CONTRACTOR, discrepancy shall obtain a hick CONTRACTOR <br /> omay may <br /> and <br /> "provide" is implied. ENGINEER before proceeding with any Work affected <br /> 0209-00700 . General Conditwns.dx <br /> Page 8 of 44 <br /> F:VEnglneanng\Cepdel Projecls10209-4th Street Bridge Over C000h ridch\0209.4th Street Bridge Over Ceach 07-2MS\0209-00700 - General CondiOane.doe' <br />
The URL can be used to link to this page
Your browser does not support the video tag.