My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-401
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 3:46:22 PM
Creation date
9/30/2015 10:19:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/21/2006
Control Number
2006-401
Agenda Item Number
7.H.
Entity Name
Timothy Rose Contracting, Inc.
Subject
4th. St./Cooch Ditch Bridge/11th. St.SW Paving
Project Number
9321
Archived Roll/Disk#
4008
Supplemental fields
SmeadsoftID
5969
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
791
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ilk <br /> 5. 08 Receipt and Application of Insurance and a Change Order shall be issued to adjust the <br /> Proceeds Contract Price accordingly. ., <br /> 5 . 10 Partial Utilization, Acknowledgment of <br /> insurance required by paragraph 5.06 will be adjus d Property Insurer <br /> with OWNER and made payable to OWNE as <br /> fiduciary for the insureds , as their interest may A. If OWNER finds it necessary to occupy or use <br /> appear, subject to the requirements of any a licable a portion or portions of the Work prior to Substantial <br /> mortgage clause and of paragraph 5.08. 6 OWNER Completion of all the Work as provided in paragraph <br /> shall deposit in a separate account an money so 14. 05, no such use or occupancy shall commence <br /> received and shall distribute it in accord ce with such before the insurers providing the property insurance <br /> agreement as the parties in interest ay reach . If no pursuant to paragraph 5.06 have acknowledged notice r <br /> other special agreement is reach d, the damaged thereof and in writing effected any changes in cover- <br /> Work shall be repaired or repla d , the moneys so age necessitated thereby. The insurers providing the <br /> received applied on account t reof, and the Work property insurance shall consent by endorsement on <br /> aZ <br /> he cost thereof cove d by an appropriate the not becanor celed , but the ermittedto apseroperty snsurance shall <br /> on account of <br /> e Order or Written A ndment. p <br /> any such partial use or occupancy. <br /> . OWNER as fi uciary shall have power to <br /> and settle any ss with the insurers unless one <br /> parties in inte st shall object in writing within 15 ARTICLE 6 - CONTRACTOR' S RESPONSIBILITIES <br /> after the ccurrence of loss to OWNER's <br /> ise of thi power. If such objection be made, <br /> ER as f uciary shad make settlement with the 6. 01 Supervision and Superintendence <br /> rs in ccordance with such agreement as the <br /> s in ' terest may reach. If no such agreement A. CONTRACTOR shall supervise, inspect, and <br /> g a parties in interest is reached, OWNER as direct the Work competently and efficiently, devoting ■ <br /> shall adjust and settle the loss with the such attention thereto and applying such skills and <br /> rs and, if required in writing by any parry in expertise as may be necessary to perform the Work in <br /> st, OWNER as fiduciary shall give bond for the accordance with the Contract Documents. CON- <br /> deo. TRACTOR shall be solely responsible for the means, <br /> methods, techniques, sequences, and procedures of <br /> 5 .09 Acceptance Of Bonds and Insurance; Option construction, but CONTRACTOR shall not be <br /> to Replace responsible for the negligence of OWNER or ■ <br /> ENGINEER in the design or specification of a specific <br /> A. If either OWNER or CONTRACTOR has any means, method, technique, sequence, or procedure of <br /> objection to the coverage afforded by or other provi- construction which is shown or indicated in and Will <br /> sions of the Bonds or insurance required to be expressly required by the Contract Documents. CON- <br /> purchased and maintained by the other party in accor- TRACTOR shall be responsible to see that the <br /> dance with Article 5 on the basis of non-conformance completed Work complies accurately with the Contract <br /> with the Contract Documents, the objecting party shall Documents. ■ <br /> so notify the other parry in writing within 10 days after <br /> receipt of the certificates (or other evidence B. At all times during the progress of the Work, <br /> requested) required by paragraph 2.05.C . OWNER CONTRACTOR shall assign a competent resident <br /> and CONTRACTOR shall each provide to the other superintendent thereto who shall not be replaced <br /> such additional information in respect of insurance without written notice to OWNER and ENGINEER <br /> provided as the other may reasonably request. If except under extraordinary circumstances. The <br /> either party does not purchase or maintain all of the superintendent will be CONTRACTOR's ■ <br /> Bonds and insurance required of such party by the representative at the Site and shall have authority to <br /> Contract Documents, such parry shall notify the other act on behalf of CONTRACTOR . All communications <br /> party in writing of such failure to purchase prior to the given to or received from the superintendent shall be <br /> start of the Work, or of such failure to maintain prior to binding on CONTRACTOR. <br /> any change in the required coverage. Without <br /> prejudice to any other right or remedy, the other party 6 .02 Labor, Working Hours <br /> may elect to obtain equivalent Bonds or insurance to ` <br /> protect such other party's interests at the expense of A. CONTRACTOR shall provide competent, <br /> the party who was required to provide such coverage, suited personnel to survey, lay out and <br /> coonstructthe bly ffWork as required by the Contract Docu- <br /> r <br /> 0209-0 71M - General Canditions.doc <br /> Page 18 of 44 <br /> F.lEngmeenng\Gapital Projects10209-4th Street Bridge Over Coouh Diteh\0209-61h Street Bridge Over Coom 07-20-08102094)0700 - General CondiHom.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.