Laserfiche WebLink
ments. CONTRACTOR shall at all times maintain ly will comply with any provisions of the General <br /> good discipline and order at the Site. Requirements applicable thereto. <br /> B. Except as otherwise required for the safety or 2 . Proposed adjustments in the <br /> protection of persons or the Work or property at the progress schedule that will change the Contract <br /> Site or adjacent thereto, and except as otherwise Times (or Milestones) shall be submitted in <br /> stated in the Contract Documents, all Work at the Site accordance with the requirements of Article 12. <br /> shall be performed during regular working hours, and Such adjustments may only be made by a <br /> CONTRACTOR will not permit overtime work or the Change Order or Written Amendment in accor- <br /> performance of Work on Saturday, Sunday, or any dance with Article 12. <br /> legal holiday without OWNER's written consent (which <br /> + will not be unreasonably withheld) given after prior 6 . 05 Substitutes and "Or-Equals" <br /> written notice to ENGINEER. <br /> A. Whenever an item of material or equipment is <br /> specified or described in the Contract Documents by <br /> 6 . 03 Services, Materials, and Equipment using the name of a proprietary item or the name of a <br /> particular Supplier, the specification or description is <br /> A. Unless otherwise specified in the General Re- intended to establish the type, function , appearance, <br /> quirements, CONTRACTOR shall provide and and quality required. Unless the specification or <br /> assume full responsibility for all services, materials, description contains or is followed by words reading <br /> equipment, labor, transportation, construction that no like, equivalent, or "or-equal" item or no <br /> equipment and machinery, tools, appliances, fuel, substitution is permitted , other items of material or <br /> + power, light, heat, telephone, water, sanitary facilities, equipment or material or equipment of other Suppliers <br /> temporary facilities, and all other facilities and may be submitted to ENGINEER for review under the <br /> incidentals necessary for the performance, testing, circumstances described below. <br /> + start-up, and completion of the Work. <br /> 1 . "Or-Equal" items: If in ENGINEER' S <br /> B. All materials and equipment incorporated into sole discretion an item of material or equipment <br /> the Work shall be as specified or, if not specified, shall proposed by CONTRACTOR is functionally <br /> be of good quality and new, except as otherwise equal to that named and sufficiently similar so <br /> provided in the Contract Documents. All warranties that no change in related Work will be required, <br /> and guarantees specifically called for by the Specifica- it may be considered by ENGINEER as an <br /> tions shall expressly run to the benefit of OWNER. If "or-equal" item, in which case review and <br /> required by ENGINEER, CONTRACTOR shall furnish approval of the proposed item may, in <br /> satisfactory evidence (including reports of required ENGINEER's sole discretion, be accomplished <br /> tests) as to the source, kind , and quality of materials without compliance with some or all of the <br /> + and equipment. All materials and equipment shall be requirements for approval of proposed substi- <br /> stored , applied , installed , connected, erected , tute items. For the purposes of this paragraph <br /> protected, used , cleaned , and conditioned in 6. 05.A. 1 , a proposed item of material or <br /> accordance with instructions of the applicable equipment will be considered functionally equal <br /> Supplier, except as otherwise may be provided in the to an item so named if: <br /> Contract Documents. <br /> a. in the exercise of reasonable <br /> + 6 .04 Progress Schedule judgment ENGINEER determines that: (i) it <br /> is at least equal in quality, durability, <br /> A. CONTRACTOR shall adhere to the progress appearance, strength , and design <br /> + schedule established in accordance with paragraph characteristics; (ii) it will reliably perform at <br /> 2 .07 as it may be adjusted from time to time as least equally well the function imposed by <br /> provided below. the design concept of the completed Project <br /> as a functioning whole, and; <br /> + 1 . CONTRACTOR shall submit to <br /> ENGINEER for acceptance (to the extent indi- b . CONTRACTOR certifies that: (i) <br /> cated in paragraph 2. 07) proposed adjustments there is no increase in cost to the OWNER; <br /> in the progress schedule that will not result in and (ii) it will conform substantially, even <br /> + changing the Contract Times (or Milestones). with deviations, to the detailed requirements <br /> Such adjustments will conform generally to the of the item named in the Contract <br /> progress schedule then in effect and additional- Documents. <br /> + <br /> 0209-00700 - General ContlBions.doc <br /> Page 19 of " <br /> RTivmennglCapitel PraJeaSM094th Street Bridge Over Coorh Oiteh102093 h Street Bridge Over Coorh 07-20-Ofi10209-00700 - General Conditions.d= <br /> + <br />