My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-012
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 12:08:00 PM
Creation date
9/30/2015 10:28:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/09/2007
Control Number
2007-012
Agenda Item Number
11.I.2
Entity Name
L.H.Tanner Construction
Subject
Indian River Drive South Sidewalk Improvements
Area
Indian River Drive
Project Number
0201
Bid Number
2007027
Supplemental fields
SmeadsoftID
6065
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant, or anyone employed by any of them, or anyone materials, and similar data to show ENGINEER the <br /> for whose acts any of them may be liable, and not services, materials, and equipment CONTRACTOR <br /> attributable, directly or indirectly, in whole or in part, to the proposes to provide and to enable ENGINEER to review <br /> fault or negligence of CONTRACTOR or any the information for the limited purposes required by <br /> r Subcontractor, Supplier, or other individual or entity paragraph 6. 17.E. <br /> directly or indirectly employed by any of them). <br /> CONTRACTOR' s duties and responsibilities for safety and B . CONTRACTOR shall also submit Samples to <br /> for protection of the Work shall continue until such time as ENGINEER for review and approval in accordance with the <br /> all the Work is completed and ENGINEER has issued a acceptable schedule of Shop Drawings and Sample <br /> notice to OWNER and CONTRACTOR in accordance with submittals. Each Sample will be identified clearly as to <br /> r paragraph 14.07.B that the Work is acceptable (except as material, Supplier, pertinent data such as catalog numbers, <br /> otherwise expressly provided in connection with Substantial and the use for which intended and otherwise as ENGI- <br /> Completion). NEER may require to enable ENGINEER to review the <br /> submittal for the limited purposes required by paragraph <br /> 6. 14 Safety Representative 6. 17.E. The numbers of each Sample to be submitted will <br /> be as specified in the Specifications. <br /> A. CONTRACTOR shall designate a qualified and <br /> experienced safety representative at the Site whose duties C. Where a Shop Drawing or Sample is required by <br /> and responsibilities shall be the prevention of accidents and the Contract Documents or the schedule of Shop Drawings <br /> the maintaining and supervising of safety precautions and and Sample submittals acceptable to ENGINEER as <br /> programs. required by paragraph 2 ,07, any related Work performed <br /> prior to ENGINEER's review and approval of the pertinent <br /> 6 . 15 Hazard Communication Programs submittal will be at the sole expense and responsibility of <br /> CONTRACTOR. <br /> ,r A. CONTRACTOR shall be responsible for coordi- <br /> nating any exchange of material safety data sheets or other D. Submittal Procedures <br /> hazard communication information required to be made <br /> available to or exchanged between or among employers at 1 . Before submitting each Shop Drawing or <br /> the Site in accordance with Laws or Regulations. Sample, CONTRACTOR shall have determined and <br /> verified: <br /> 6. 16 Emergencies <br /> a. all field measurements, quantities, dimen- <br /> A. In emergencies affecting the safety or protection of sions, specified performance criteria, installation <br /> persons or the Work or property at the Site or adjacent requirements, materials, catalog numbers, and <br /> thereto, CONTRACTOR is obligated to act to prevent similar information with respect thereto; <br /> threatened damage, injury, or loss. CONTRACTOR shall <br /> give ENGINEER prompt written notice if CONTRACTOR b. all materials with respect to intended use, <br /> believes that any significant changes in the Work or fabrication, shipping, handling, storage, assem- <br /> variations from the Contract Documents have been caused bly, and installation pertaining to the perfor- <br /> thereby or are required as a result thereof If ENGINEER mance of the Work; <br /> determines that a change in the Contract Documents is <br /> required because of the action taken by CONTRACTOR in c. all information relative to means, meth- <br /> response to such an emergency, a Work Change Directive ods, techniques, sequences, and procedures of <br /> or Change Order will be issued. construction and safety precautions and <br /> programs incident thereto; and <br /> 6. 17 Shop Drawings and Samples <br /> d. CONTRACTOR shall also have <br /> A. CONTRACTOR shall submit Shop Drawings to reviewed and coordinated each Shop Drawing or <br /> ENGINEER for review and approval in accordance with the Sample with other Shop Drawings and Samples <br /> acceptable schedule of Shop Drawings and Sample and with the requirements of the Work and the <br /> submittals. All submittals will be identified as ENGINEER Contract Documents. <br /> may require and in the number of copies specified in the <br /> General Requirements. The data shown on the Shop 2. Each submittal shall bear a stamp or <br /> Drawings will be complete with respect to quantities, specific written indication that CONTRACTOR has <br /> dimensions, specified performance and design criteria, satisfied CONTRACTOk's obligations under the <br /> r <br /> 00700 - 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.