Laserfiche WebLink
Consultant, or anyone employed by any of them, or anyone materials, and similar data to show ENGINEER the <br /> for whose acts any of them may be liable, and not services, materials, and equipment CONTRACTOR <br /> attributable, directly or indirectly, in whole or in part, to the proposes to provide and to enable ENGINEER to review <br /> fault or negligence of CONTRACTOR or any the information for the limited purposes required by <br /> r Subcontractor, Supplier, or other individual or entity paragraph 6. 17.E. <br /> directly or indirectly employed by any of them). <br /> CONTRACTOR' s duties and responsibilities for safety and B . CONTRACTOR shall also submit Samples to <br /> for protection of the Work shall continue until such time as ENGINEER for review and approval in accordance with the <br /> all the Work is completed and ENGINEER has issued a acceptable schedule of Shop Drawings and Sample <br /> notice to OWNER and CONTRACTOR in accordance with submittals. Each Sample will be identified clearly as to <br /> r paragraph 14.07.B that the Work is acceptable (except as material, Supplier, pertinent data such as catalog numbers, <br /> otherwise expressly provided in connection with Substantial and the use for which intended and otherwise as ENGI- <br /> Completion). NEER may require to enable ENGINEER to review the <br /> submittal for the limited purposes required by paragraph <br /> 6. 14 Safety Representative 6. 17.E. The numbers of each Sample to be submitted will <br /> be as specified in the Specifications. <br /> A. CONTRACTOR shall designate a qualified and <br /> experienced safety representative at the Site whose duties C. Where a Shop Drawing or Sample is required by <br /> and responsibilities shall be the prevention of accidents and the Contract Documents or the schedule of Shop Drawings <br /> the maintaining and supervising of safety precautions and and Sample submittals acceptable to ENGINEER as <br /> programs. required by paragraph 2 ,07, any related Work performed <br /> prior to ENGINEER's review and approval of the pertinent <br /> 6 . 15 Hazard Communication Programs submittal will be at the sole expense and responsibility of <br /> CONTRACTOR. <br /> ,r A. CONTRACTOR shall be responsible for coordi- <br /> nating any exchange of material safety data sheets or other D. Submittal Procedures <br /> hazard communication information required to be made <br /> available to or exchanged between or among employers at 1 . Before submitting each Shop Drawing or <br /> the Site in accordance with Laws or Regulations. Sample, CONTRACTOR shall have determined and <br /> verified: <br /> 6. 16 Emergencies <br /> a. all field measurements, quantities, dimen- <br /> A. In emergencies affecting the safety or protection of sions, specified performance criteria, installation <br /> persons or the Work or property at the Site or adjacent requirements, materials, catalog numbers, and <br /> thereto, CONTRACTOR is obligated to act to prevent similar information with respect thereto; <br /> threatened damage, injury, or loss. CONTRACTOR shall <br /> give ENGINEER prompt written notice if CONTRACTOR b. all materials with respect to intended use, <br /> believes that any significant changes in the Work or fabrication, shipping, handling, storage, assem- <br /> variations from the Contract Documents have been caused bly, and installation pertaining to the perfor- <br /> thereby or are required as a result thereof If ENGINEER mance of the Work; <br /> determines that a change in the Contract Documents is <br /> required because of the action taken by CONTRACTOR in c. all information relative to means, meth- <br /> response to such an emergency, a Work Change Directive ods, techniques, sequences, and procedures of <br /> or Change Order will be issued. construction and safety precautions and <br /> programs incident thereto; and <br /> 6. 17 Shop Drawings and Samples <br /> d. CONTRACTOR shall also have <br /> A. CONTRACTOR shall submit Shop Drawings to reviewed and coordinated each Shop Drawing or <br /> ENGINEER for review and approval in accordance with the Sample with other Shop Drawings and Samples <br /> acceptable schedule of Shop Drawings and Sample and with the requirements of the Work and the <br /> submittals. All submittals will be identified as ENGINEER Contract Documents. <br /> may require and in the number of copies specified in the <br /> General Requirements. The data shown on the Shop 2. Each submittal shall bear a stamp or <br /> Drawings will be complete with respect to quantities, specific written indication that CONTRACTOR has <br /> dimensions, specified performance and design criteria, satisfied CONTRACTOk's obligations under the <br /> r <br /> 00700 - 25 <br />