My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-012
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 12:08:00 PM
Creation date
9/30/2015 10:28:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/09/2007
Control Number
2007-012
Agenda Item Number
11.I.2
Entity Name
L.H.Tanner Construction
Subject
Indian River Drive South Sidewalk Improvements
Area
Indian River Drive
Project Number
0201
Bid Number
2007027
Supplemental fields
SmeadsoftID
6065
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Documents with respect to F. Resubmittal Procedures <br /> CONTRACTOR' s review and approval of that <br /> submittal. 1 . CONTRACTOR shall make corrections <br /> required by ENGINEER and shall return the <br /> 3. At the time of each submittal, CON- required number of corrected copies of Shop <br /> TRACTOR shall give ENGINEER specific written Drawings and submit as required new Samples for <br /> notice of such variations, if any, that the Shop Draw- review and approval. CONTRACTOR shall direct <br /> ing or Sample submitted may have from the require- specific attention in writing to revisions other than <br /> ments of the Contract Documents, such notice to be the corrections called for by ENGINEER on previ- <br /> in a written communication separate from the ous submittals. <br /> submittal; and, in addition, shall cause a specific <br /> notation to be made on each Shop Drawing and New Paragraph 6.17.G has been added. See the <br /> Sample submitted to ENGINEER for review and Supplementary Conditions. <br /> approval of each such variation. <br /> 6. 18 Continuing the Work <br /> E. ENGINEER 's Review <br /> A. CONTRACTOR shall carry on the Work and <br /> 1 . ENGINEER will timely review and adhere to the progress schedule during all disputes or <br /> approve Shop Drawings and Samples in accordance disagreements with OWNER. No Work shall be delayed or <br /> with the schedule of Shop Drawings and Sample postponed pending resolution of any disputes or <br /> submittals acceptable to ENGINEER. disagreements, except as permitted by paragraph 15.04 or as <br /> ENGINEER's review and approval will be only to OWNER and CONTRACTOR may otherwise agree in <br /> determine if the items covered by the submittals will, writing. <br /> after installation or incorporation in the Work, con- <br /> form to the information given in the Contract Docu- 6. 19 CONTRACTOR 's General Warranty and <br /> ments and be compatible with the design concept of Guarantee <br /> the completed Project as a functioning whole as <br /> indicated by the Contract Documents. A. CONTRACTOR warrants and guarantees to <br /> OWNER, ENGINEER, and ENGINEER's Consultants that <br /> 2 . ENGINEER's review and approval will all Work will be in accordance with the Contract Docu- <br /> not extend to means, methods, techniques, ments and will not be defective. CONTRACTOR's <br /> sequences, or procedures of construction (except warranty and guarantee hereunder excludes defects or <br /> where a particular means, method, technique, damage caused by: <br /> sequence, or procedure of construction is <br /> specifically and expressly called for by the Contract 1 . abuse, modification, or improper main- <br /> Documents) or to safety precautions or programs tenance or operation by persons other than CON- <br /> incident thereto. The review and approval of a TRACTOR, Subcontractors, Suppliers, or any other <br /> separate item as such will not indicate approval of individual or entity for whom CONTRACTOR is <br /> the assembly in which the item functions. responsible; or <br /> 3 . ENGINEER's review and approval of 2. normal wear and tear under normal <br /> Shop Drawings or Samples shall not relieve CON- usage. <br /> TRACTOR from responsibility for any variation <br /> from the requirements of the Contract Documents B. CONTRACTOR's obligation to perform and <br /> unless CONTRACTOR has in writing called complete the Work in accordance with the Contract <br /> ENGINEER's attention to each such variation at the Documents shall be absolute. None of the following will <br /> time of each submittal as required by paragraph constitute an acceptance of Work that is not in accordance <br /> 6. 17.D.3 and ENGINEER has given written with the Contract Documents or a release of <br /> approval of each such variation by specific written CONTRACTOR's obligation to perform the Work in <br /> notation thereof incorporated in or accompanying accordance with the Contract Documents: <br /> the Shop Drawing or Sample approval; nor will any <br /> approval by ENGINEER relieve CONTRACTOR 1 . observations by ENGINEER; <br /> from responsibility for complying with the require- <br /> ments of paragraph 6 . 17 .) . 1 . 2 . recommendation by ENGINEER or pay- <br /> ment by OWNER of any progress or final payment; <br /> 00700 - 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.