Laserfiche WebLink
r <br /> 8 .08 Inspections, Tests, and Approvals CONTRACTOR's executed Work. Based on information <br /> obtained during such visits and observations, ENGINEER, <br /> A. OWNER's responsibility in respect to certain for the benefit of OWNER, will determine, in general, if the <br /> inspections, tests, and approvals is set forth in paragraph Work is proceeding in accordance with the Contract <br /> 13.03 .B. Documents. ENGINEER will not be required to make <br /> exhaustive or continuous inspections on the Site to check <br /> 8 .09 Limitations on OWNER 's Responsibilities the quality or quantity of the Work. ENGINEER's efforts <br /> will be directed toward providing for OWNER a greater <br /> A. The OWNER shall not supervise, direct, or have degree of confidence that the completed Work will conform <br /> control or authority over, nor be responsible for, generally to the Contract Documents. On the basis of such <br /> CONTRACTOR's means, methods, techniques, sequences, visits and observations, ENGINEER will keep OWNER <br /> or procedures of construction, or the safety precautions and informed of the progress of the Work and will endeavor to <br /> programs incident thereto, or for any failure of CON- guard OWNER against defective Work. <br /> TRACTOR to comply with Laws and Regulations apphca- <br /> ble to the performance of the Work. OWNER will not be B . ENGINEER's visits and observations are subject <br /> responsible for CONTRACTOR's failure to perform the to all the limitations on ENGINEER's authority and <br /> Work in accordance with the Contract Documents. responsibility set forth in paragraph 9 . 10, and particularly, <br /> but without limitation, during or as a result of ENGINEER's <br /> i 8 . 10 Undisclosed Hazardous Environmental visits or observations of CONTRACTOR's Work <br /> Condition ENGINEER will not supervise, direct, control, or have <br /> authority over or be responsible for CONTRACTOR's <br /> A. OWNER's responsibility in respect to an undis- means, methods, techniques, sequences, or procedures of <br /> closed Hazardous Environmental Condition is set forth in construction, or the safety precautions and programs <br /> paragraph 4.06. incident thereto, or for any failure of CONTRACTOR to <br /> comply with Laws and Regulations applicable to the <br /> 8. 11 Evidence of Financial Arrangements performance of the Work. <br /> A. If and to the extent OWNER has agreed to furnish 9 .03 Project Representative <br /> CONTRACTOR reasonable evidence that financial <br /> arrangements have been made to satisfy OWNER's A. If OWNER and ENGINEER agree, ENGINEER <br /> obligations under the Contract Documents, OWNER' s will furnish a Resident Project Representative to assist <br /> r responsibility in respect thereof will be as set forth in the ENGINEER in providing more extensive observation of the <br /> Supplementary Conditions. Work. The responsibilities and authority and limitations <br /> thereon of any such Resident Project Representative and <br /> assistants will be as provided in paragraph 9 . 10 and in the <br /> ARTICLE 9 - ENGINEER' S STATUS DURING Supplementary Conditions. If OWNER designates another <br /> CONSTRUCTION representative or agent to represent OWNER at the Site <br /> who is not ENGINEER's Consultant, agent or employee, <br /> the responsibilities and authority and limitations thereon of <br /> 9.01 OWNER 'S Representative such other individual or entity will be as provided in the <br /> Supplementary Conditions. <br /> A. ENGINEER will be OWNER's representative <br /> during the construction period. The duties and responsi- 9.04 Clarifications and Interpretations <br /> bilities and the limitations of authority of ENGINEER as <br /> OWNER's representative during construction are set forth A. ENGINEER will issue with reasonable promptness <br />+� in the Contract Documents and will not be changed without such written clarifications or interpretations of the require- <br /> written consent of OWNER and ENGINEER. ments of the Contract Documents as ENGINEER may <br /> determine necessary, which shall be consistent with the <br /> i 9 .02 Visits to Site intent of and reasonably inferable from the Contract Docu- <br /> ments. Such written clarifications and interpretations will <br /> A. ENGINEER will make visits to the Site at inter- be binding on OWNER and CONTRACTOR. If OWNER <br /> vals appropriate to the various stages of construction as and CONTRACTOR are unable to agree on entitlement to <br /> s ENGINEER deems necessary in order to observe as an or on the amount or extent, if any, of any adjustment in the <br /> experienced and qualified design professional the progress Contract Price or Contract Times, or both, that should be <br /> that has been made and the quality of the various aspects of allowed as a result of a written clarification or interpre- <br /> r 00700 - 29 <br />