tation, a Claim may be made therefor as provided in upon OWNER and CONTRACTOR, subject to the <br /> paragraph 10.05. provisions of paragraph 10.05 . <br /> 9.05 Authorized Variations in Work 9.09 Decisions on Requirements of Contract <br /> Documents and Acceptability of Work <br /> A. ENGINEER may authorize minor variations in the <br /> Work from the requirements of the Contract Documents A. ENGINEER will be thc initial interpreter of the <br /> which do not involve an adjustment in the Contract Price or requirements of the Contract Documents and judge of the <br /> the Contract Times and are compatible with the design acceptability of the Work thereunder. Claims, disputes and <br /> concept of the completed Project as a functioning whole as other matters relating to the acceptability of the Work, the <br /> indicated by the Contract Documents. These may be quantities and classifications of Unit Price Work, the <br /> accomplished by a Field Order and will be binding on interpretation of the requirements of the Contract <br /> OWNER and also on CONTRACTOR, who shall perform Documents pertaining to the performance of the Work, and <br /> the Work involved promptly. If OWNER and CONTRAC- Claims seeking changes in the Contract Price or Contract <br /> TOR are unable to agree on entitlement to or on the amount Times will be referred initially to ENGINEER in writing, in <br /> or extent, if any, of any adjustment in the Contract Price or accordance with the provisions of paragraph 10.05, with a <br /> Contract Times, or both, as a result of a Field Order, a request for a formal decision. <br /> Claim may be made therefor as provided in paragraph <br /> 10.05. Paragraph 9.09.B has been deleted in its entirety. <br /> 9.06 Rejecting Defective Work 9 . 10 Limitations on ENGINEER 's Authority and <br /> Responsibilities <br /> A. ENGINEER will have authority to disapprove or <br /> reject Work which ENGINEER believes to be defective, or A. Neither ENGINEER's authority or responsibility <br /> that ENGINEER believes will not produce a completed under this Article 9 or under any other provision of the <br /> Project that conforms to the Contract Documents or that Contract Documents nor any decision made by ENGINEER <br /> will prejudice the integrity of the design concept of the in good faith either to exercise or not exercise such <br /> completed Project as a functioning whole as indicated by authority or responsibility or the undertaking, exercise, or <br /> the Contract Documents. ENGINEER will also have performance of any authority or responsibility by <br /> authority to require special inspection or testing of the Work ENGINEER shall create, impose, or give rise to any duty in <br /> as provided in paragraph 13.04, whether or not the Work is contract, tort, or otherwise owed by ENGINEER to <br /> fabricated, installed, or completed. CONTRACTOR, any Subcontractor, any Supplier, any <br /> other individual or entity, or to any surety for or employee <br /> 9.07 Shop Drawings, Change Orders and Payments or agent of any of them <br /> A. In connection with ENGINEER's authority as to B. ENGINEER will not supervise, direct, control, or <br /> Shop Drawings and Samples, see paragraph 6. 17. have authority over or be responsible for CONTRACTOR's <br /> means, methods, techniques, sequences, or procedures of <br /> B. In connection with ENGINEER's authority as to construction, or the safety precautions and programs <br /> Change Orders, see Articles 10, 11 , and 12. incident thereto, or for any failure of CONTRACTOR to <br /> comply with Laws and Regulations applicable to the perfor- <br /> C. In connection with ENGINEER's authority as to mance of the Work. ENGINEER will not be responsible <br /> Applications for Payment, see Article 14. for CONTRACTOR's failure to perform the Work in accor- <br /> dance with the Contract Documents. <br /> 9.08 Determinations for Unit Price Work <br /> C. ENGINEER will not be responsible for the acts or <br /> A. ENGINEER will detemtine the actual quantities omissions of CONTRACTOR or of any Subcontractor, any <br /> and classifications of Unit Price Work performed by Supplier, or of any other individual or entity performing <br /> CONTRACTOR. ENGINEER will review with CON- any of the Work. <br /> TRACTOR the ENGINEER's preliminary determinations <br /> on such matters before rendering a written decision thereon D. ENGINEER's review of the final Application for <br /> (by recommendation of an Application for Payment or Payment and accompanying documentation and all mainte- <br /> otherwise). ENGINEER's written decision thereon will be nance and operating instructions, schedules, guarantees, <br /> final and binding (except as modified by ENGINEER to Bonds, certificates of inspection, tests and approvals, and <br /> reflect changed factual conditions or more accurate data) other documentation required to be delivered by paragraph <br /> 00700 - 30 <br />