My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-012
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 12:08:00 PM
Creation date
9/30/2015 10:28:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/09/2007
Control Number
2007-012
Agenda Item Number
11.I.2
Entity Name
L.H.Tanner Construction
Subject
Indian River Drive South Sidewalk Improvements
Area
Indian River Drive
Project Number
0201
Bid Number
2007027
Supplemental fields
SmeadsoftID
6065
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> .� 14.07.A will only be to determine generally that their correction of defective Work under paragraph 13 .09, <br /> content complies with the requirements of, and in the case or (iii) agreed to by the parties; <br /> of certificates of inspections, tests, and approvals that the <br /> results certified indicate compliance with, the Contract 2. changes in the Contract Price or Contract <br /> Documents. Times which are agreed to by the parties, including <br /> any undisputed sum or amount of time for Work <br /> E. The limitations upon authority and responsibility actually performed in accordance with a Work <br /> M set forth in this paragraph 9 . 10 shall also apply to Change Directive; and <br /> ENGINEER's Consultants, Resident Project Repre- <br /> sentative, and assistants. 3 . changes in the Contract Price or Contract <br /> ,r Times which embody the substance of any written <br /> ARTICLE 10 - CHANGES IN THE WORK; CLAIMS decision rendered by ENGINEER pursuant to para- <br /> graph 10.05; provided that, in lieu of executing any <br /> such Change Order, an appeal may be taken from <br /> 10.01 Authorized Changes in the Work any such decision in accordance with the provisions <br /> of the Contract Documents and applicable Laws and <br /> A. Without invalidating the Agreement and without Regulations, but during any such appeal, <br /> notice to any surety, OWNER may, at any time or from time CONTRACTOR shall carry on the Work and adhere <br /> to time, order additions, deletions, or revisions in the Work to the progress schedule as provided in paragraph <br /> by a Written Amendment, a Change Order, or a Work 6. 18.A. <br /> Change Directive. Upon receipt of any such document, <br /> CONTRACTOR shall promptly proceed with the Work 10.04 Notification to Surety <br /> involved which will be performed under the applicable <br /> conditions of the Contract Documents (except as otherwise A. If notice of any change affecting the general scope <br /> 4W specifically provided). of the Work or the provisions of the Contract Documents <br /> (including, but not limited to, Contract Price or Contract <br /> B . If OWNER and CONTRACTOR are unable to Times) is required by the provisions of any Bond to be <br /> agree on entitlement to, or on the amount or extent, if any, given to a surety, the giving of any such notice will be <br /> 'o of an adjustment in the Contract Price or Contract Times, or CONTRACTOR's responsibility. The amount of each <br /> both, that should be allowed as a result of a Work Change applicable Bond will be adjusted to reflect the effect of any <br /> Directive, a Claim may be made therefor as provided in such change. <br /> dw paragraph 10.05. <br /> 10.05 Claims and Disputes <br /> 10 . 02 Unauthorized Changes in the Work <br /> A. Notice: Written notice stating the general nature <br /> A. CONTRACTOR shall not be entitled to an of each Claim, dispute, or other matter shall be delivered by <br /> increase in the Contract Price or an extension of the the claimant to ENGINEER and the other party to the <br /> Contract Times with respect to any work performed that is Contract promptly (but in no event later than 30 days) after <br /> dw not required by the Contract Documents as amended, the start of the event giving rise thereto. Notice of the <br /> modified, or supplemented as provided in paragraph 3 .04, amount or extent of the Claim, dispute, or other matter with <br /> except in the case of an emergency as provided in paragraph supporting data shall be delivered to the ENGINEER and <br /> 6. 16 or in the case of uncovering Work as provided in the other party to the Contract within 60 days after the start <br /> paragraph 13 .04.B. of such event (unless ENGINEER allows additional time <br /> for claimant to submit additional or more accurate data in <br /> 10.03 Execution of Change Orders support of such Claim, dispute, or other matter). A Claim <br /> for an adjustment in Contract Price shall be prepared in <br /> A. OWNER and CONTRACTOR shall execute accordance with the provisions of paragraph 12 .01 .13. A <br /> appropriate Change Orders recommended by ENGINEER Claim for an adjustment in Contract Time shall be prepared <br /> (or Written Amendments) covering: in accordance with the provisions of paragraph 12.02.B. <br /> Each Claim shall be accompanied by claimant's written <br /> 1 . changes in the Work which are : (i) statement that the adjustment claimed is the entire <br /> ordered by OWNER pursuant to paragraph 10.0l .A, adjustment to which the claimant believes it is entitled as a <br /> (ii) required because of acceptance of defective result of said event. The opposing party shall submit any <br /> Work under paragraph 13 .08.A or OWNER' S response to ENGINEER and the claimant within 30 days <br /> 4W <br /> ow 00700 - 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.