My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-012
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 12:08:00 PM
Creation date
9/30/2015 10:28:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/09/2007
Control Number
2007-012
Agenda Item Number
11.I.2
Entity Name
L.H.Tanner Construction
Subject
Indian River Drive South Sidewalk Improvements
Area
Indian River Drive
Project Number
0201
Bid Number
2007027
Supplemental fields
SmeadsoftID
6065
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
replacement, and reconstruction. If the parties are unable to agree as to the ameuater <br /> extent thereof, CONTRACTOR may make a Claim therefor as provided in paragraph <br /> 10.05. <br /> 13.05 OWNER May Stop the Work - <br /> SC-13.05.A. Delete paragraph GC- 13. 05.A in its entirety and insert the following paragraph in its <br /> place: <br /> A. If the Work is defective , or CONTRACTOR fails to supply sufficient skilled <br /> workers or suitable materials or equipment, or fails to comply with permit <br /> requirements, or fails to comply with the technical specifications , or fails to <br /> perform the Work in such a way that the completed Work will conform to the <br /> Contract Documents, OWNER may order CONTRACTOR to stop the Work, or any <br /> portion thereof, until the cause for such order has been eliminated ; however, this <br /> right of OWNER to stop the Work shall not give rise to any duty on the part of <br /> OWNER to exercise this right for the benefit of CONTRACTOR , any <br /> Subcontractor, any Supplier, any other individual or entity, or any surety for, or <br /> employee or agent of any of them. <br /> 14.02 Progress Payments <br /> SC- 14. 02. 6 . 5 . Delete paragraph GC- 14. 02. 8. 5. d in its entirety and insert the following paragraph <br /> in its place: <br /> d . ENGINEER has actual knowledge of the occurrence of any of the events <br /> enumerated in paragraph 15 .02.A; or <br /> SC- 14. 02. 6 . 5 . Add the following sentences at the end of paragraph GC- 14. 02. 8. 5: <br /> e . OWNER has been required to pay ENGINEER or ENGINEER's Consultant <br /> additional compensation because of CONTRACTOR delays or rejection of <br /> defective Work; or <br /> f. OWNER has been required to pay an independent testing laboratory for <br /> subsequent inspections , tests, or approvals taken after initial failing <br /> inspections, tests , or approvals . <br /> 0201 -00800 - Supplementary Conditions <br /> 008009 <br /> FAEngineennglCaptal ProjedsW2 3128-Inman River Drive Sidinvalk-South-Highland Drive SM0201 Indian River Drive South Sidewalk - Gontr Docs\0201 .00800 - <br /> Supplementary Conditions noo Rev. 05101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.