Laserfiche WebLink
r <br /> SC-12 .01 Change of Contract Price <br /> SC- 12 . 01 . 6 . 2 Delete the following text from paragraph GC- 12. 01 . B. 2 and add a "period" () at <br /> the end of the remaining text. : <br /> r <br /> with p ph 12 01 r 2 ) � n <br /> SC- 12 . 01 Delete paragraphs GC- 12. 01 . 8. 3 and GC- 12. 01 . 0 in their entirety. <br /> SC-12.06 Delay Damages <br /> SC- 12 . 06 Delete paragraphs GC- 12. 06.A and GC- 12. 06. B in their entirety and insert the <br /> _ following paragraph in their place: <br /> A. In no event shall OWNER or ENGINEER be liable to CONTRACTOR, any <br /> Subcontractor, any Supplier, or any other person or organization , or to any surety <br /> r for or employee or agent of any of them, for damages arising out of or resulting <br /> from any delay whatsoever. The CONTRACTOR's sole and exclusive remedy for <br /> delays to the project are time extensions . <br /> r <br /> SC-13.03 Test and Inspections <br /> r SC- 13 . 03. 6. Delete the first sentence of paragraph GC- 13. 03. 8 (up to the colon) in its entirety, <br /> and insert the following sentences in its place: <br /> B. OWNER shall employ and pay for the services of an independent testing laboratory to <br /> r perform all initial inspections , tests , or approvals required by the Contract Documents <br /> except those inspections , tests , or approvals listed immediately below. Subsequent <br /> inspections , tests , or approvals required after initial failing inspections , tests , or <br /> approvals shall be paid for by the CONTRACTOR by backcharge to subsequent <br /> applications for payment. The CONTRACTOR shall arrange, obtain , and pay for the <br /> following inspections, tests , or approvals : <br /> r <br /> 1 . inspections, tests , or approvals covered by paragraphs 13 . 03 . 0 and 13 . 03. D <br /> below; <br />.. 2 . costs incurred in connection with tests or inspections conducted pursuant to <br /> paragraph 13 . 04 . 6 shall be paid as provided in said paragraph 13 . 04. 6 ; <br /> 3 . tests otherwise specifically provided in the Contract Documents . <br /> r <br /> SC- 13 . 03 . Add the following paragraph immediately after paragraph GC- 13. 03. F: <br /> r <br /> G . The OWNER shall use the following testing laboratory: <br /> SC-13.04 Uncovering Work <br /> SC- 13 . 04. 6 Delete portions of the last two sentences as follows: <br /> If, however, such Work is not found to be defective, CONTRACTOR shall be allowed-aa <br /> '^ the GORtFaGt RFlGe a an extension of the Contract Times (or Milestones) ,-OF <br /> both-, directly attributable to such uncovering , exposure, observation , inspection , testing , <br /> replacement, and reconstruction . If the parties are unable to agree as to thearaeuat 0r <br /> 0201 -00800 - Supplementary Conditions.doc <br /> r00800 8 <br /> FdEngineering\Capital Rrojecu%02014)3128-Indian River Dore Sidewalk-Soulh.Highland Drive SS M0201 Indian River Drive South Sidewalk - Contract Docs10201 -00800 - <br /> Supplennentary Conduons.doc Rev. 08/01 <br />