Laserfiche WebLink
i <br /> to be adhered to by the CONTRACTOR throughout the Project's construction . <br /> The OWNER reserves the right to require the CONTRACTOR to employ <br /> additional pollution control measures , when in the sole opinion of the OWNER , <br /> they are warranted . If site specific conditions require additional erosion and <br /> stormwater pollution control measures during any phase of construction or <br /> operation to prevent erosion or to control sediment or other pollution , beyond <br /> those specified in the Drawings or herein , implement additional best <br /> management practices as necessary, in accordance with Chapter 4 , " Best <br /> Management Practices for Erosion and Sedimentation Control" of the Florida <br /> Erosion and Sediment Control Inspector' s Manual , included herein in Appendix <br /> r „ B„ <br /> D . The OWNER may terminate this Contract if the CONTRACTOR fails to comply <br /> r with this Section . Alternatively, the OWNER may halt the CONTRACTOR's <br /> operations until the CONTRACTOR is in full compliance with this Section . Ifthe <br /> OWNER halts the CONTRACTOR's work as a result of its failure to comply with <br /> this Section , the Construction Contract time clock will continue to run . <br /> E . In addition to these Specifications , comply with Chapter 4 , " Best Management <br /> Practices for Erosion and Sedimentation Control" of the Florida Erosion and <br /> Sediment Control Inspector's Manual , included herein in Appendix " B . " If there <br /> is a conflict between the referenced Chapter 4 and these Specifications, the <br /> more stringent requirement shall prevail . <br /> 1 . 2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br /> M <br /> A. The OWNER has obtained certain permits for this project and they are listed in <br /> paragraph SC-6 . 08 of the Supplementary Conditions . Per paragraph SC- <br /> 6 . 08 . 13 of the Supplementary Conditions , the CONTRACTOR shall apply for, <br /> obtain , and pay for all other required permits and licenses. This may include <br /> but not be limited to: <br /> 1 . Long-term or short-term dewatering permit as required by the St. Johns <br /> River Water Management District (SJRWMD) . Contact SJRWMD at <br /> (321 ) 984-4940 to determine which permit is required and the associated <br /> statutory requirements ; and <br /> 2 . The State of Florida Generic Permit for Stormwater Discharge From <br /> r Large and Small Construction Activities . Contact the Florida <br /> Department of Environmental Protection (FDEP) at (866) 336-6312 <br /> (toll free) or (850) 245-7522 or <br /> r www. dep . state . fl . us/water/stormwater/npdes/ <br /> B . Provide copies of all permits to the OWNER and ENGINEER and comply with <br /> . all conditions contained in all permits at no extra cost to the OWNER. If there is <br /> a conflict between any permit requirement and these Specifications , the more <br /> stringent specification or requirement shall govern . <br /> r <br /> r Last revised 7/9/01 01025-4 Technical Specifications <br /> FAEngineeringlCapital Projects10201-03128-Indian River Drive Sidewalk-South-Highland Drive SM0201 Indian River Drive South <br /> Sidewalk - Contract Docs10201 - Technical Specificalions.doc <br />