Laserfiche WebLink
provide artificial light sufficient to permit work to be carried on satisfactorily and safely. <br /> GC 25 DUST CONTROL <br />+ For the duration of the contract, the Contractor shall , at its expense, maintain all excavations, roads, <br /> plant sites , borrow areas and all other work areas free from dust. Code-required or industry-accepted <br /> methods of dust control suitable for the area involved and approved by Owner will be permitted. <br /> GC 26 POLLUTION CONTROL <br /> Contractor shall , at its expense, perform its work so as not to discharge into the atmosphere, any body <br /> of water, the ground or groundwater, from any source , smoke, dust or other contaminants in violation of the <br />+ laws, rules and regulations of all federal , state and local air and water pollution requirements. Contractor shall , <br /> at its expense, provide suitable facilities to prevent any such discharges. Contractor shall immediately report <br /> to Owner and appropriate authorities any spill of contaminant. <br />+ GC27 DEBRIS DISPOSAL <br /> All debris shall be legally disposed of at licensed disposal site(s). <br /> GC 27 EXPLOSIVES AND HAZARDOUS MATERIALS <br />+ Contractor shall obtain all required federal , state and local permits and licenses and shall be <br /> responsible for the safe and proper handling, transportation , storage and use of any explosive or hazardous <br /> material brought onto or encountered with in the site. The Contractor will notify the Owner immediately if <br />+ explosive or hazardous materials are encountered on the site . Contractor shall maintain and post as <br /> necessary, Material hazard Data Sheets for all applicable hazardous materials used in the course of the work. <br /> In the event that hazardous material is improperly handled or stored by the Contractor or its sub-contractors, <br /> which results in contamination of the site, Contractor shall immediately notify the Owner and the appropriate <br /> governmental authority and shall take whatever action is necessary or desirable to remediate the <br /> contamination at the Contractor's sole cost and expense. Contractor shall indemnify and hold harmless the <br /> Owner from any expense, action or liability resulting from such contamination and remedial actions. <br />+ <br /> GC 28 LABOR <br /> Contractor shall employ only competent and skilled personnel to perform the work. Contractor shall, if <br /> requested by Owner, remove from thejobsite any personnel of Contractorwho is determined by Owner to be <br />+ unfit or working in violation of any provision of the Contract. Contractor and all subcontractors shall be bound <br /> by and comply with all applicable Federal , State and local laws regarding labor. All work performed after <br /> regular working hours, on Sundays or legal holidays, shall be performed without additional expense to the <br /> Owner. <br /> GC 29 SAFETY <br /> The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions <br />+ and programs in connection with the work . Contractor will provide to each worker on the job site the proper <br /> safety equipment for the duties being performed by the worker and will not permit any worker on the job site <br /> who fails or refuses to use the safety equipment. The Contractor shall provide and maintain all necessary <br />+ watchmen , barricades, warning lights, and signs and take all necessary precautions for the protection of all <br /> persons involved in the work, the public, and all employees or representatives of Owner. All work and all <br /> equipment, machinery, materials and tools shall be in compliance with and conform to all applicable laws, <br /> ordinance, rules and regulations . <br /> GC 30 PROGRESS <br /> During construction , Contractor shall keep a marked-up and up-to-date set of drawings showing as- <br /> built conditions on that site as an accurate record of all deviations between work as shown and work as <br />+ installed . These drawings shall be available to Owner and Engineer for inspection at any time. <br /> During construction, Contractor shall keep a marked-up and up-to date set of specifications showing <br />+ as-is conditions on the site annotated to clearly indicate all substitutions or product selections that are <br /> incorporate into the work. These specifications shall be available to Owner and Engineer for inspection at any <br /> time . <br /> 36 <br /> MrzM 9:5429 rug <br />