of the contract. ■ <br /> 20 . PRE-BID SITE INSPECTION AND PRE-BID CONFERENCE <br /> SITE INSPECTION - NONE <br /> PRE-BID CONFERENCE - NONE <br /> 21 . TIME OF COMPLETION AND LIQUIDATED DAMAGES <br /> BASE BID — TIMEFRAME <br /> The work to be performed as part of the BASE BID project timeframe shall commence on the date of <br /> the written notice to proceed given by the City/County, which is anticipated to be issued on April 3 , <br /> 2006 . All work that is to be performed as part of this contract shall be substantially completed by <br /> November 30, 2006 and totally 100% completed by December 31 , 2006 , with such extensions of <br /> time in calendar days as are provided for in the General Terms and Conditions outlined below. <br /> If said work is not substantially completed within the specified timeframes listed above , the <br /> contractor shall be liable and hereby agrees to pay the owner as liquidated damages, and not as a <br /> penalty, the sum of $ 1 ,423. 00 dollars per calendar day between the date Substantial Completion <br /> of the work is achieved and the Final 100% Completion date and or Acceptance by the City/County <br /> for each and every day or part of a day thereafter that said work remains incomplete. <br /> 22 . SPECIAL PROVISIONS <br /> The Contractor shall comply with the following special provisions as part of the contract for the <br /> Flagler Drive Downtown Waterfront Seawall Replacement Project: <br /> ( 1 ) (A) BASE BID- TIMEFRAME <br /> The total time for the project construction will commence with a Written Notice to <br /> Proceed from the City/County that is anticipated to be issued to the Contractor on <br /> April 3 , 2006 with the project being substantially completed by the Contractor on <br /> November 30 , 2006 and totally 100% completed by the Contractor on December 31 , <br /> 2006. <br /> (B) CPM SCHEDULE AND NARRITIVE <br /> The Contractor shall submit to the City as part of his bid submission , a detailed r <br /> construction schedule in CPM format outlining the proposed progress of the work to <br /> be performed by the Contractor and his subcontractors for the BASE BID — <br /> TIMEFRAME . <br /> The Contractors CPM schedule for the BASE BID — TIMEFRAME shall include but <br /> not be limited to the demolition phasing dates of the work, manufacturing dates of all ■ <br /> components , all phasing dates of the total work required for each component to be <br /> manufactured and installed , the start and completion dates for each phase of the <br /> 38Q" 9:54:Z)n <br /> • <br />