My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-012A
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 12:10:01 PM
Creation date
9/30/2015 10:29:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/09/2007
Control Number
2007-012A
Agenda Item Number
11.1.2
Entity Name
L.H. Tanner
Subject
Contract/Specifications Indian River Drive South Sidewalks
Area
Indian River Drive
Project Number
0201
Bid Number
2007027
Supplemental fields
SmeadsoftID
6066
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the contract. ■ <br /> 20 . PRE-BID SITE INSPECTION AND PRE-BID CONFERENCE <br /> SITE INSPECTION - NONE <br /> PRE-BID CONFERENCE - NONE <br /> 21 . TIME OF COMPLETION AND LIQUIDATED DAMAGES <br /> BASE BID — TIMEFRAME <br /> The work to be performed as part of the BASE BID project timeframe shall commence on the date of <br /> the written notice to proceed given by the City/County, which is anticipated to be issued on April 3 , <br /> 2006 . All work that is to be performed as part of this contract shall be substantially completed by <br /> November 30, 2006 and totally 100% completed by December 31 , 2006 , with such extensions of <br /> time in calendar days as are provided for in the General Terms and Conditions outlined below. <br /> If said work is not substantially completed within the specified timeframes listed above , the <br /> contractor shall be liable and hereby agrees to pay the owner as liquidated damages, and not as a <br /> penalty, the sum of $ 1 ,423. 00 dollars per calendar day between the date Substantial Completion <br /> of the work is achieved and the Final 100% Completion date and or Acceptance by the City/County <br /> for each and every day or part of a day thereafter that said work remains incomplete. <br /> 22 . SPECIAL PROVISIONS <br /> The Contractor shall comply with the following special provisions as part of the contract for the <br /> Flagler Drive Downtown Waterfront Seawall Replacement Project: <br /> ( 1 ) (A) BASE BID- TIMEFRAME <br /> The total time for the project construction will commence with a Written Notice to <br /> Proceed from the City/County that is anticipated to be issued to the Contractor on <br /> April 3 , 2006 with the project being substantially completed by the Contractor on <br /> November 30 , 2006 and totally 100% completed by the Contractor on December 31 , <br /> 2006. <br /> (B) CPM SCHEDULE AND NARRITIVE <br /> The Contractor shall submit to the City as part of his bid submission , a detailed r <br /> construction schedule in CPM format outlining the proposed progress of the work to <br /> be performed by the Contractor and his subcontractors for the BASE BID — <br /> TIMEFRAME . <br /> The Contractors CPM schedule for the BASE BID — TIMEFRAME shall include but <br /> not be limited to the demolition phasing dates of the work, manufacturing dates of all ■ <br /> components , all phasing dates of the total work required for each component to be <br /> manufactured and installed , the start and completion dates for each phase of the <br /> 38Q" 9:54:Z)n <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.