My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-012A
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 12:10:01 PM
Creation date
9/30/2015 10:29:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/09/2007
Control Number
2007-012A
Agenda Item Number
11.1.2
Entity Name
L.H. Tanner
Subject
Contract/Specifications Indian River Drive South Sidewalks
Area
Indian River Drive
Project Number
0201
Bid Number
2007027
Supplemental fields
SmeadsoftID
6066
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• individual components to be installed , street closure dates and durations including <br /> the start and completion dates of each phase. <br /> In addition to the CPM schedule for the BASE BID — TIMEFRAME, the Contractor <br /> shall submit, in narrative format, a detailed description of the means and methods <br />,. for the Contractor's work including but not limited to the mobilization and <br /> demobilization of all equipment and materials , the demolition sequencing of the <br /> work, the individual phasing sequencing of each component manufacturing and <br /> installation , the Contractor's proposed manpower and equipment allocations and <br /> commitments for each phase of the work, the Contractor's proposed work hours for <br /> each day to be worked , the phasing of road closures with their closure dates and <br /> durations , work sequence and days of the week the Contractor and his <br /> subcontractors will require from the City to complete the work within the time frames <br /> of the BASE BID — TIMEFRAME . <br /> The CPM schedules for the BASE BID — TIMEFRAME and narrative approach for <br /> the project will be used by the City in determining the best value in awarding the <br /> construction contract. <br /> The contractor will not be allowed to change his submitted CPM schedule for the <br /> BASE BID — TIMEFRAME prior to and or after the Award of Contract and the Notice <br />,w to Proceed is issued by the City/County without prior written approval of the <br /> City/County's Project Manager. <br /> (2) The Contractor shall provide daily clean up of the project work area . Cleanup shall include <br /> but not be limited to removal of trash , construction debris , excavated materials and materials <br /> generated as a result of the demolition of the existing sidewalks, curbs and gutters , road way <br /> components . <br /> (3) The Contractor shall restore all roadways immediately upon the completion of each segment <br /> and or phase of the construction . Such restoration shall be to the satisfaction of the City/County. <br /> (4) The Contractor shall submit for the City/County review and approval , as part of his bid <br /> submission , a sample copy of his company's daily reporting format for reporting the progress of <br />,. construction . This format shall include but not be limited to the detailing of all labor, equipment and <br /> materials used in the construction of the project along with the areas worked , type of work <br /> performed , problems encountered and daily weather conditions at the work areas. The Contractor <br /> a will be required to submit to the City/County's Project Manager, copies of all daily reports completed <br /> by the Contractor's personnel and his subcontractors at the beginning of the following work day for <br /> each day worked . <br /> (5) The Contractor shall be required to submit (2) copies of 8 1 /2"x 11 " progress color photos <br /> indicating the completion of the contract work with the dates that the work was performed , on a <br /> weekly basis to the City's Project Manager. The Contractor shall also be required to submit as-built <br />+� surveys, by a registered land surveyor licensed to do work in the State of Florida , on a weekly basis <br /> to the City's Project managerthat indicate the completion of contract work by the Contractor and his <br /> subcontractors . <br /> (6) The Contractor shall provide as part of the contract work , adequate sanitary facilities , within <br /> the fenced-in areas of the total project area , for the use of the Contractor's workmen . <br /> 56 <br /> W2M9:5429AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.