Laserfiche WebLink
(7) Street Lighting Systems , Pedestrian Lighting Systems Electrical distribution Systems, <br /> The Contractor shall at all times protect and maintain the operation of the existing street lighting <br /> systems, the existing pedestrian lighting systems and the existing underground electrical distribution <br /> systems within the project area including but not limited to all poles , conduits , wiring , pull boxes , <br /> transformers , switchgear assemblies , meter assemblies, service connection assemblies and lighting <br /> fixtures that are located within the project whether shown or not shown on the contract drawings . <br /> The Contractor shall protect and maintain all existing landscaping and irrigation systems within the <br /> project area during construction . <br /> i <br /> (8) . The Contractor shall maintain and provide a safe access for vehicles and pedestrians at all <br /> times within the project area . <br /> (9) Landscaping and Irrigation Systems - The contractor shall at all times protect and maintain <br /> the existing landscaping and irrigation systems within the project area . <br /> • <br /> 23 . INSURANCE PROVISIONS <br /> 24. COMPLIANCE WITH REQUIRED CONTRACT PROVISIONS .. <br /> Bidders shall cite compliance with the Required Contract Provisions and shall execute and include <br /> the following in their bid proposals: <br /> 1 . Buy America Certificate of Compliance <br /> 2 . Certification regarding Lobbying <br /> 3 . Certification Regarding Debarment, Suspension , Ineligibility and Voluntary Exclusion- or ` <br /> explanation <br /> w <br /> 4 . Bid Opportunity List. <br /> 5. Certification of Non-Collusion <br /> 6 . Drug-Free Workplace Certification <br /> • <br /> 7 . All prequalified contractors bidding on this project must include with their bid proposal a copy <br /> of their Certification of Current Capacity (FDOT Form 375-020-22) and Status of Contracts <br /> on Hand (FDOT Form 375-020-21 ). <br /> w <br /> Failure to include the above forms may result in a determination that the bid proposal is non- <br /> responsive. <br /> (***"*Federo! Wage Rages Must be Attached) <br /> End of Special Terms and Conditions <br /> • <br /> 57 <br /> 3M2996 9:5429 AM <br /> ■ <br />