My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-012A
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 12:10:01 PM
Creation date
9/30/2015 10:29:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/09/2007
Control Number
2007-012A
Agenda Item Number
11.1.2
Entity Name
L.H. Tanner
Subject
Contract/Specifications Indian River Drive South Sidewalks
Area
Indian River Drive
Project Number
0201
Bid Number
2007027
Supplemental fields
SmeadsoftID
6066
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Erosion and Sediment Control Inspector's Manual <br /> Desicin Criteria <br /> No formal design is required . The following criteria shall be met: <br /> ■ <br /> Drainage Area <br /> The maximum allowable drainage area is 5 acres (2 ha) . <br /> Dimensions <br /> r <br /> The minimum allowable height measured from the upslope side of the dike is 18 inches (45 <br /> cm) . Top width shall be a minimum of 2 feet (60 cm) with a minimum base width of 4 .5 feet <br /> ( 1 .4 m) . (See Plate 4 . 15a) <br /> Side Slopes <br /> 3 : 1 or flatter. <br /> Grade <br /> The channel behind the dike shall have a positive grade to a stabilized outlet. If the <br /> channel slope is less than or equal to 2% , no stabilization is usually required . If the slope <br /> is greater than 2% , the channel shall be stabilized in accordance with STORMWATER <br /> CONVEYANCE CHANNEL - Section 5.35 (ES BMP 1 . 35) . <br /> ■ <br /> Outlet <br /> 1 . The diverted runoff, if free of sediment, must be released through a stabilized <br /> outlet or channel . <br /> 2 . Sediment-laden runoff must be diverted and released through a sediment trapping <br /> facility. r <br /> Construction Specifications <br /> 1 . Whenever feasible , the dike should be built before construction begins on the • <br /> project. <br /> ■ <br /> 2 . The dike should be adequately compacted to prevent failure . <br /> 3 . Temporary or permanent seeding and mulch shall be applied to the dike within 15 ' <br /> days of construction . <br /> 4 . The dike should be located to minimize damages by construction operations and ' <br /> traffic. <br /> 4-56 <br /> ■ <br />
The URL can be used to link to this page
Your browser does not support the video tag.