Laserfiche WebLink
Chapter 4 - Best Management Practices for Erosion and Sediment Control <br /> Maintenance <br /> The measure shall be inspected after every storm and repairs made to the dike , flow <br /> channel and outlet, as necessary . Approximately once every week , whether a storm has <br /> occurred or not, the measure shall be inspected and repairs made if needed . Damages <br /> caused by construction traffic or other activity must be repaired before the end of each <br /> working day. <br /> dw <br /> Compacted Soil <br /> 1 B" Min. ; ;' 'r <br /> �— Flow <br /> ll�1� <br /> �---- 4.5' Min. <br /> r <br /> Plate 4. 15a Temporary Diversion Dike <br />.� Source: Virginia DSWC <br /> 4-57 <br />