My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-012A
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 12:10:01 PM
Creation date
9/30/2015 10:29:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/09/2007
Control Number
2007-012A
Agenda Item Number
11.1.2
Entity Name
L.H. Tanner
Subject
Contract/Specifications Indian River Drive South Sidewalks
Area
Indian River Drive
Project Number
0201
Bid Number
2007027
Supplemental fields
SmeadsoftID
6066
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Erosion and Sediment Control Inspector's Manual • <br /> i <br /> Block Inlet with Plywood and Sandbags, <br /> as Necessary, to Prevent Water from Entering .. <br /> Flow <br /> FlowFlow <br /> !C \ <br /> % NIS :•; . -• '<4, / 1< �• , y` ^i\r\A\ ` ; \ @ I iiI n \ <br /> N. <br /> f1 � <br /> Flow <br /> Flow �T <br /> A r <br /> Remove Bricks or �. � • <br /> Blocks for Outlet a' E i <br /> Trap may be Placed Behind <br /> As Required or at End of Inlet <br /> / 2:1 or Flatter 2: 1 or Flatter <br /> Tzx <br /> Ti1 ' Minn <br /> T N <br /> t 11 ' Min <br /> ./ar <br /> Cross-Section Section A-A <br /> Curb Drain <br /> Yard Drain <br /> NOTE Where curb is in place, provide a 1 foot wide <br /> opening in the curb or use a sandbag dam to <br /> force water over the curb to the trap. <br /> Construction Specifications i <br /> 1 . Sediment shall be removed and trap restored to its original dimensions when the sediment has <br /> accumulated to 112 the design depth of the trap. Removed sediment shall be deposited in a suitable <br /> area and in such a manner that it will not erode. <br /> 2. The structure shall be inspected after each rain and repairs made as needed. <br /> 3. Construction operations shall be carried out in such a manner that erosion and water pollution shall <br /> be minimized. <br /> 4. The sediment trap shall be removed and area stabilized when the remaining drainage area has been <br /> properly stabilized. <br /> 5. All cut and fill slopes shall be 2: 1 or flatter. <br /> Plate 4. 25f Storm Inlet Sediment Trap <br /> Source: NRCS <br /> 4-76 • <br />
The URL can be used to link to this page
Your browser does not support the video tag.