Laserfiche WebLink
Chapter 4 - Best Management Practices for Erosion and Sediment Control <br /> Removal <br /> Sediment traps must be removed after the contributing drainage area is stabilized . Plans <br /> All should show how the site of the sediment trap is to be graded and stabilized after removal . <br /> JIM <br /> GRAVEL FILTER BAGS STAo® AT <br /> LEAST T610 LAYM KCH SLOT TPAT <br /> r N7 GAPS ARE EVICEM EE MEN T}E END POINTS 'A' nAT BE ita- R <br /> GUM CR AD.YZW BAGS TRO N FLW LIE POINT 'B' <br /> A B A <br /> 14-111 1-N=11ll t pit c111 HI , M <br /> a <br /> r 01VERT EXCAVATED AW5A <br /> FOR SED171M Na GAPS NNE TO EE EYIDENi <br /> SIDE VIEW FRONT VIEW <br /> (NO SCALE ) <br /> r <br /> LEAVE A 12-M DMOtH <br /> GDP BEKEEN PIPE A%Z BAGS <br /> FOR gDSEDm IfTOT AREA <br /> EVt PLAa A SMLE FM IrCRAVEL FILTER <br /> { EAS IN FRONT IF PRUDER-Y <br /> )STALLED STRAV BALES <br /> r <br /> m_ni=11, <br /> tic 1160 <br /> FRONT VIEW <br /> � (ALTERNATIVE ) <br /> TDP VIEW GAVEL CONTAINED NIPERVVIOUS BURLAP BAAGSEOR <br /> SYNTHETIC NET BAGS 11/8-INCH MESH AND BE <br /> APPROXIMATELY 24 INCHES LONG. 12 INCHES VIDE <br /> AND 6 INCHES HIGH <br /> r <br /> Plate 4.25g Small Sediment Trap Located within a Stormwater Conveyance Channel <br /> Source: HydroDynamics, Inc. <br /> r <br /> 4-77 <br />