Laserfiche WebLink
attention thereto and applying such skills and expertise as <br /> may be necessary to perform the Work in accordance with B. All materials and equipment incorporated into the <br /> the Contact Documents. CONTRACTOR shall be solely Work shall be as specified or, if not specified, shall be of <br /> responsible for the means, methods, techniques, sequences, good quality and new, except as otherwise provided in the <br /> and procedures of construction, but CONTRACTOR shall Contract Documents. All warranties and guarantees <br /> not be responsible for the negligence of OWNER or specifically called for by the Specifications shall expressly <br /> ENGINEER in the design or specification of a specific run to the benefit of OWNER. If required by ENGINEER, <br /> means, method, technique, sequence, or procedure of CONTRACTOR shall furnish satisfactory evidence <br /> construction which is shown or indicated in and expressly (including reports of required tests) as to the source, kind, <br /> required by the Contract Documents. CONTRACTOR and quality of materials and equipment. All materials and <br /> shall be responsible to see that the completed Work equipment shall be stored, applied, installed, connected, <br /> complies accurately with the Contract Documents. erected, protected, used, cleaned, and conditioned in <br /> accordance with instructions of the applicable Supplier, <br /> B. At all times during the progress of the Work, except as otherwise may be provided in the Contract Docu- <br /> CONTRACTOR shall assign a competent resident superin- ments. <br /> tendent thereto who shall not be replaced without written <br /> notice to OWNER and ENGINEER except under 6.04 Progress Schedule <br /> extraordinary circumstances. The superintendent will be <br /> CONTRACTOR's representative at the Site and shall have A. CONTRACTOR shall adhere to the progress <br /> authority to act on behalf of CONTRACTOR. All schedule established in accordance with paragraph 2.07 as it <br /> communications given to or received from the superin- may be adjusted from time to time as provided below. <br /> tendent shall be binding on CONTRACTOR. <br /> 1 . CONTRACTOR shall submit to ENGI- <br /> 6.02 Labor; Working Hours NEER for acceptance (to the extent indicated in <br /> paragraph 2.07) proposed adjustments in the prog- <br /> A. CONTRACTOR shall provide competent, suitably ress schedule that will not result in changing the <br /> qualified personnel to survey, lay out, and construct the Contract Times (or Milestones). Such adjustments <br /> Work as required by the Contract Documents. CON- will conform generally to the progress schedule then <br /> TRACTOR shall at all times maintain good discipline and in effect and additionally will comply with any <br /> order at the Site. provisions of the General Requirements applicable <br /> thereto. <br /> B. Except as otherwise required for the safety or <br /> protection of persons or the Work or property at the Site or 2. Proposed adjustments in the progress <br /> adjacent thereto, and except as otherwise stated in the schedule that will change the Contract Times (or <br /> Contract Documents, all Work at the Site shall be Milestones) shall be submitted in accordance with <br /> performed during regular working hours, and CON- the requirements of Article 12. Such adjustments <br /> TRACTOR will not permit overtime work or the may only be made by a Change Order or Written <br /> performance of Work on Saturday, Sunday, or any legal Amendment in accordance with Article 12. <br /> holiday without OWNER's written consent (which will not <br /> be unreasonably withheld) given after prior written notice to <br /> ENGINEER. <br /> New Paragraphs 6.02.B.1, 2, 3, 4, and 5 have been <br /> added. Seethe Supplementary Conditions. <br /> 6.03 Services, Materials, and Equipment <br /> A. Unless otherwise specified in the General Re- <br /> quirements, CONTRACTOR shall provide and assume full <br /> responsibility for all services, materials, equipment, labor, <br /> transportation, construction equipment and machinery, <br /> tools, appliances, fuel, power, light, heat, telephone, water, <br /> sanitary facilities, temporary facilities, and all other <br /> facilities and incidentals necessary for the performance, <br /> testing, start-up, and completion of the Work. <br /> 00700 - 20 <br />