My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.05 Substitutes and "Or-Equals " <br /> b. CONTRACTOR shall submit sufficient <br /> Paragraph 6.05.A has been deleted and replaced with a information as provided below to allow ENGI- <br /> new paragraph. See the Supplementary Conditions. NEER to determine that the item of material or <br /> A Whene' ro_ an m o f -....«.,_:..� „_ equipment proposed is essentially equivalent to <br /> specified" of aeserihea in the, ContFaet D,.,....irents by using that named and an acceptable substitute therefor. <br /> the name of a .._,....:etaFy item or the name of .. ....-.«:^. .l „_ Requests for review of proposed substitute items <br /> Supplier-, <br /> ..the ^ ..,,:a^„«:,... of description :s tended to of material or equipment will not be accepted by <br /> establish the filnetion and quality ENGINEER from anyone other than CON- <br /> required. Unless the speeifieRtiffil OF ae.,,._:_t:,. e8fAaMS Of TRACTOR. <br /> is followed b ...orris reading that no like equivalent, ..4cor equal" item OF no substitution is pemm4ed, other iterns_ <br /> c. The procedure for review by ENGI- <br /> of matefial or equipment of material or equipment of othe will be as set forth in paragraph <br /> Supplio_. _ a. , be ^..hued tn vwrcrn.ccn o.._ _evie.. 6.05.A.2.d, as supplemented in the General <br /> •-"'a"- 'h" a^^""'h"a hPIA-A Requirements and as ENGINEER may decide is <br /> appropriate under the circumstances. <br /> 1 . "Or-Equal" Items: If in ENGINEER's <br /> sole discretion an item of material or equipment pro- d. CONTRACTOR shall first make written <br /> posed by CONTRACTOR is functionally equal to application to ENGINEER for review of a <br /> that named and sufficiently similar so that no change proposed substitute item of material or <br /> in related Work will be required, it may be con- equipment that CONTRACTOR seeks to furnish <br /> sidered by ENGINEER as an ` or-equal" item, in or use. The application shall certify that the <br /> which case review and approval of the proposed proposed substitute item will perform adequately <br /> item may, in ENGINEER's sole discretion, be the functions and achieve the results called for <br /> accomplished without compliance with some or all by the general design, be similar in substance to <br /> of the requirements for approval of proposed substi- that specified, and be suited to the same use as <br /> tute items. For the purposes of this paragraph that specified. The application will state the <br /> 6.05 .A. 1 , a proposed item of material or equipment extent, if any, to which the use of the proposed <br /> will be considered functionally equal to an item so substitute item will prejudice CONTRACTOR's <br /> named if: achievement of Substantial Completion on time, <br /> whether or not use of the proposed substitute <br /> Sentence 6.05.A.1.a.(ii) has been deleted and replaced item in the Work will require a change in any of <br /> with a new sentence. See the Supplementary the Contract Documents (or in the provisions of <br /> Conditions. any other direct contract with OWNER for work <br /> a. in the exercise of reasonable judgment on the Project) to adapt the design to the <br /> ENGINEER determines that: (i) it is at least proposed substitute item and whether or not <br /> equal in quality, durability, appearance, strength, incorporation or use of the proposed substitute <br /> and design characteristics; (ii) it will item in connection with the Work is subject to <br /> ^"`^"" at leas' equally well the a.....t"n payment of any license fee or royalty. All <br /> initiosed by the design eeneept of the ,._mplete., variations of the proposed substitute item from <br /> Pizajeet as ., a-..,.t:e_:..g whole and; that specified will be identified in the applica- <br /> tion, and available engineering, sales, <br /> b. CONTRACTOR certifies that: (i) there is maintenance, repair, and replacement services <br /> no increase in cost to the OWNER; and (ii) it will be indicated. The application will also <br /> will conform substantially, even with deviations, contain an itemized estimate of all costs or <br /> to the detailed requirements of the item named in credits that will result directly or indirectly from <br /> the Contract Documents. use of such substitute item, including costs of <br /> redesign and claims of other contractors affected <br /> 2. Substitute Items by any resulting change, all of which will be <br /> considered by ENGINEER in evaluating the <br /> a. If in ENGINEER's sole discretion an proposed substitute item. ENGINEER may <br /> item of material or equipment proposed by require CONTRACTOR to famish additional <br /> CONTRACTOR does not qualify as an data about the proposed substitute item <br /> "or-equal" item under paragraph 6.05 .A. 1 , it will <br /> be considered a proposed substitute item. <br /> 00700 - 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.