B. Substitute Construction Methods or Procedures: or other individual or entity to furnish or perform any of the <br /> If a specific means, method, technique, sequence, or Work against whom CONTRACTOR has reasonable <br /> procedure of construction is shown or indicated in and objection. <br /> expressly required by the Contract Documents, CON- <br /> TRACTOR may famish or utilize a substitute means, meth- B. If the Supplementary Conditions require the <br /> od, technique, sequence, or procedure of construction identity of certain Subcontractors, Suppliers, or other <br /> approved by ENGINEER. CONTRACTOR shall submit individuals or entities to be submitted to OWNER in <br /> sufficient information to allow ENGINEER, in advance for acceptance by OWNER by a specified date <br /> ENGINEER's sole discretion, to determine that the prior to the Effective Date of the Agreement, and if <br /> substitute proposed is equivalent to that expressly called for CONTRACTOR has submitted a list thereof in accordance <br /> by the Contract Documents. The procedure for review by with the Supplementary Conditions, OWNER' s acceptance <br /> ENGINEER will be similar to that provided in subpara- (either in writing or by failing to make written objection <br /> graph 6.05.A.2 . thereto by the date indicated for acceptance or objection in <br /> the Bidding Documents or the Contract Documents) of any <br /> C. Engineer 's Evaluation, ENGINEER will be such Subcontractor, Supplier, or other individual or entity <br /> allowed a reasonable time within which to evaluate each so identified may be revoked on the basis of reasonable <br /> proposal or submittal made pursuant to paragraphs 6.05 .A objection after due investigation. CONTRACTOR shall <br /> and 6.05.B . ENGINEER will be the sole judge of accept- submit an acceptable replacement for the rejected <br /> ability. No ` or-equal" or substitute will be ordered, Subcontractor, Supplier, or other individual or entity, and <br /> installed or utilized until ENGINEER's review is complete, the Contract Price will be adjusted by the difference in the <br /> which will be evidenced by either a Change Order for a cost occasioned by such replacement, and an appropriate <br /> substitute or an approved Shop Drawing for an "or equal." Change Order will be issued or Written Amendment signed. <br /> ENGINEER will advise CONTRACTOR in writing of any No acceptance by OWNER of any such Subcontractor, <br /> negative determination. Supplier, or other individual or entity, whether initially or as <br /> a replacement, shall constitute a waiver of any right of <br /> D. Special Guarantee: OWNER may require CON- OWNER or ENGINEER to reject defective Work. <br /> TRACTOR to famish at CONTRACTOR's expense a <br /> special performance guarantee or other surety with respect C. CONTRACTOR shall be fully responsible to <br /> to any substitute. OWNER and ENGINEER for all acts and omissions of the <br /> Subcontractors, Suppliers, and other individuals or entities <br /> E. ENGINEER 's Cost Reimbursement: ENGINEER performing or furnishing any of the Work just as <br /> will record time required by ENGINEER and CONTRACTOR is responsible for CONTRACTOR's own <br /> ENGINEER's Consultants in evaluating substitute proposed acts and omissions. Nothing in the Contract Documents <br /> or submitted by CONTRACTOR pursuant to paragraphs shall create for the benefit of any such Subcontractor, <br /> 6.05 .A.2 and 6.05.13 and in making changes in the Contract Supplier, or other individual or entity any contractual <br /> Documents (or in the provisions of any other direct contract relationship between OWNER or ENGINEER and any such <br /> with OWNER for work on the Project) occasioned thereby. Subcontractor, Supplier or other individual or entity, nor <br /> Whether or not ENGINEER approves a substitute item so shall it create any obligation on the part of OWNER or <br /> proposed or submitted by CONTRACTOR, CON- ENGINEER to pay or to see to the payment of any moneys <br /> TRACTOR shall reimburse OWNER for the charges of due any such Subcontractor, Supplier, or other individual or <br /> ENGINEER and ENGINEER's Consultants for evaluating entity except as may otherwise be required by Laws and <br /> each such proposed substitute. Regulations. <br /> F. CONTRACTOR 's Expense: CONTRACTOR shall A new sentence has been added at the end of Paragraph <br /> provide all data in support of any proposed substitute or 6.06.C. See the Supplementary Conditions. <br /> "or-equal" at CONTRACTOR' s expense. <br /> D. CONTRACTOR shall be solely responsible for <br /> 6.06 Concerning Subcontractors, Suppliers, and Others scheduling and coordinating the Work of Subcontractors, <br /> Suppliers, and other individuals or entities performing or <br /> A. CONTRACTOR shall not employ any Subcon- furnishing any of the Work under a direct or indirect <br /> tractor, Supplier, or other individual or entity (including contract with CONTRACTOR. <br /> those acceptable to OWNER as indicated in paragraph <br /> 6.06.13), whether initially or as a replacement, against whom E. CONTRACTOR shall require all Subcontractors, <br /> OWNER may have reasonable objection. CONTRACTOR Suppliers, and such other individuals or entities performing <br /> shall not be required to employ any Subcontractor, Supplier, <br /> 00700 - 22 <br />