Laserfiche WebLink
adjustment, a Claim may be made therefor as provided in disposal of such waste materials, rubbish, and other debris <br /> paragraph 10.05 . shall conform to applicable Laws and Regulations. <br /> 6. 10 Taxes C. Cleaning: Prior to Substantial Completion of the <br /> Work CONTRACTOR shall clean the Site and make it <br /> A. CONTRACTOR shall pay all sales, consumer, ready for utilization by OWNER. At the completion of the <br /> use, and other similar taxes required to be paid by Work CONTRACTOR shall remove from the Site all tools, <br /> CONTRACTOR in accordance with the Laws and appliances, construction equipment and machinery, and <br /> Regulations of the place of the Project which are applicable surplus materials and shall restore to original condition all <br /> during the performance of the Work. property not designated for alteration by the Contract <br /> Documents. <br /> 6. 11 Use ofSite and Other Areas <br /> D. Loading Structures: CONTRACTOR shall not <br /> A. Limitation on Use of Site and Other Areas load nor permit any part of any structure to be loaded in any <br /> manner that will endanger the structure, nor shall <br /> 1 . CONTRACTOR shall confine CONTRACTOR subject any part of the Work or adjacent <br /> construction equipment, the storage of materials and property to stresses or pressures that will endanger it. <br /> equipment, and the operations of workers to the Site <br /> and other areas permitted by Laws and Regulations, 6. 12 Record Documents <br /> and shall not unreasonably encumber the Site and <br /> other areas with construction equipment or other A. CONTRACTOR shall maintain in a safe place at <br /> materials or equipment. CONTRACTOR shall the Site one record copy of all Drawings, Specifications, <br /> assume full responsibility for any damage to any Addenda, Written Amendments, Change Orders, Work <br /> such land or area, or to the owner or occupant Change Directives, Field Orders, and written interpretations <br /> thereof, or of any adjacent land or areas resulting and clarifications in good order and annotated to show <br /> from the performance of the Work. changes made during construction. These record <br /> documents together with all approved Samples and a <br /> 2. Should any claim be made by any such counterpart of all approved Shop Drawings will be available <br /> owner or occupant because of the performance of to ENGINEER for reference. Upon completion of the <br /> the Work, CONTRACTOR shall promptly settle Work, these record documents, Samples, and Shop <br /> with such other party by negotiation or otherwise Drawings will be delivered to ENGINEER for OWNER. <br /> resolve the claim by arbitration or other dispute <br /> resolution proceeding or at law. 6 . 13 Safety and Protection <br /> 3 . To the fullest extent permitted by Laws A. CONTRACTOR shall be solely responsible for <br /> and Regulations, CONTRACTOR shall indemnify initiating, maintaining and supervising all safety precautions <br /> and hold harmless OWNER, ENGINEER, and programs in connection with the Work. <br /> ENGINEER's Consultant, and the officers, CONTRACTOR shall take all necessary precautions for the <br /> directors, partners, employees, agents, and other safety of, and shall provide the necessary protection to <br /> consultants of each and any of them from and prevent damage, injury or loss to: <br /> against all claims, costs, losses, and damages <br /> (including but not limited to all fees and charges of 1 . all persons on the Site or who may be <br /> engineers, architects, attorneys, and other affected by the Work; <br /> professionals and all court or arbitration or other <br /> dispute resolution costs) arising out of or relating to 2. all the Work and materials and equip- <br /> any claim or action, legal or equitable, brought by ment to be incorporated therein, whether in storage <br /> any such owner or occupant against OWNER, on or off the Site; and <br /> ENGINEER, or any other party indemnified <br /> hereunder to the extent caused by or based upon 3. other property at the Site or adjacent <br /> CONTRACTOR's performance of the Work. thereto, including trees, shrubs, lawns, walks, pave- <br /> ments, roadways, structures, utilities, and Under- <br /> B. Removal of Debris During Performance of the ground Facilities not designated for removal, reloca- <br /> Work. During the progress of the Work CONTRACTOR tion, or replacement in the course of construction. <br /> shall keep the Site and other areas free from accumulations <br /> of waste materials, rubbish, and other debris. Removal and <br /> 00700 - 24 <br />