adjustment, a Claim may be made therefor as provided in disposal of such waste materials, rubbish, and other debris
<br /> paragraph 10.05 . shall conform to applicable Laws and Regulations.
<br /> 6. 10 Taxes C. Cleaning: Prior to Substantial Completion of the
<br /> Work CONTRACTOR shall clean the Site and make it
<br /> A. CONTRACTOR shall pay all sales, consumer, ready for utilization by OWNER. At the completion of the
<br /> use, and other similar taxes required to be paid by Work CONTRACTOR shall remove from the Site all tools,
<br /> CONTRACTOR in accordance with the Laws and appliances, construction equipment and machinery, and
<br /> Regulations of the place of the Project which are applicable surplus materials and shall restore to original condition all
<br /> during the performance of the Work. property not designated for alteration by the Contract
<br /> Documents.
<br /> 6. 11 Use ofSite and Other Areas
<br /> D. Loading Structures: CONTRACTOR shall not
<br /> A. Limitation on Use of Site and Other Areas load nor permit any part of any structure to be loaded in any
<br /> manner that will endanger the structure, nor shall
<br /> 1 . CONTRACTOR shall confine CONTRACTOR subject any part of the Work or adjacent
<br /> construction equipment, the storage of materials and property to stresses or pressures that will endanger it.
<br /> equipment, and the operations of workers to the Site
<br /> and other areas permitted by Laws and Regulations, 6. 12 Record Documents
<br /> and shall not unreasonably encumber the Site and
<br /> other areas with construction equipment or other A. CONTRACTOR shall maintain in a safe place at
<br /> materials or equipment. CONTRACTOR shall the Site one record copy of all Drawings, Specifications,
<br /> assume full responsibility for any damage to any Addenda, Written Amendments, Change Orders, Work
<br /> such land or area, or to the owner or occupant Change Directives, Field Orders, and written interpretations
<br /> thereof, or of any adjacent land or areas resulting and clarifications in good order and annotated to show
<br /> from the performance of the Work. changes made during construction. These record
<br /> documents together with all approved Samples and a
<br /> 2. Should any claim be made by any such counterpart of all approved Shop Drawings will be available
<br /> owner or occupant because of the performance of to ENGINEER for reference. Upon completion of the
<br /> the Work, CONTRACTOR shall promptly settle Work, these record documents, Samples, and Shop
<br /> with such other party by negotiation or otherwise Drawings will be delivered to ENGINEER for OWNER.
<br /> resolve the claim by arbitration or other dispute
<br /> resolution proceeding or at law. 6 . 13 Safety and Protection
<br /> 3 . To the fullest extent permitted by Laws A. CONTRACTOR shall be solely responsible for
<br /> and Regulations, CONTRACTOR shall indemnify initiating, maintaining and supervising all safety precautions
<br /> and hold harmless OWNER, ENGINEER, and programs in connection with the Work.
<br /> ENGINEER's Consultant, and the officers, CONTRACTOR shall take all necessary precautions for the
<br /> directors, partners, employees, agents, and other safety of, and shall provide the necessary protection to
<br /> consultants of each and any of them from and prevent damage, injury or loss to:
<br /> against all claims, costs, losses, and damages
<br /> (including but not limited to all fees and charges of 1 . all persons on the Site or who may be
<br /> engineers, architects, attorneys, and other affected by the Work;
<br /> professionals and all court or arbitration or other
<br /> dispute resolution costs) arising out of or relating to 2. all the Work and materials and equip-
<br /> any claim or action, legal or equitable, brought by ment to be incorporated therein, whether in storage
<br /> any such owner or occupant against OWNER, on or off the Site; and
<br /> ENGINEER, or any other party indemnified
<br /> hereunder to the extent caused by or based upon 3. other property at the Site or adjacent
<br /> CONTRACTOR's performance of the Work. thereto, including trees, shrubs, lawns, walks, pave-
<br /> ments, roadways, structures, utilities, and Under-
<br /> B. Removal of Debris During Performance of the ground Facilities not designated for removal, reloca-
<br /> Work. During the progress of the Work CONTRACTOR tion, or replacement in the course of construction.
<br /> shall keep the Site and other areas free from accumulations
<br /> of waste materials, rubbish, and other debris. Removal and
<br /> 00700 - 24
<br />
|