Laserfiche WebLink
B. CONTRACTOR shall comply with all applicable give ENGINEER prompt written notice if CONTRACTOR <br /> Laws and Regulations relating to the safety of persons or believes that any significant changes in the Work or <br /> property, or to the protection of persons or property from variations from the Contract Documents have been caused <br /> damage, injury, or loss; and shall erect and maintain all thereby or are required as a result thereof If ENGINEER <br /> necessary safeguards for such safety and protection. deteim nes that a change in the Contract Documents is <br /> CONTRACTOR shall notify owners of adjacent property required because of the action taken by CONTRACTOR in <br /> and of Underground Facilities and other utility owners when response to such an emergency, a Work Change Directive <br /> prosecution of the Work may affect them, and shall or Change Order will be issued. <br /> cooperate with them in the protection, removal, relocation, <br /> and replacement of their property. All damage, injury, or 6. 17 Shop Drawings and Samples <br /> loss to any property referred to in paragraph 6. 13 .A.2 or <br /> 6. 13 .A.3 caused, directly or indirectly, in whole or in part, A. CONTRACTOR shall submit Shop Drawings to <br /> by CONTRACTOR, any Subcontractor, Supplier, or any ENGINEER for review and approval in accordance with the <br /> other individual or entity directly or indirectly employed by acceptable schedule of Shop Drawings and Sample <br /> any of them to perform any of the Work, or anyone for submittals. All submittals will be identified as ENGINEER <br /> whose acts any of them may be liable, shall be remedied by may require and in the number of copies specified in the <br /> CONTRACTOR (except damage or loss attributable to the General Requirements. The data shown on the Shop <br /> fault of Drawings or Specifications or to the acts or Drawings will be complete with respect to quantities, <br /> omissions of OWNER or ENGINEER or ENGINEER's dimensions, specified performance and design criteria, <br /> Consultant, or anyone employed by any of them, or anyone materials, and similar data to show ENGINEER the <br /> for whose acts any of them may be liable, and not services, materials, and equipment CONTRACTOR <br /> attributable, directly or indirectly, in whole or in part, to the proposes to provide and to enable ENGINEER to review <br /> fault or negligence of CONTRACTOR or any the information for the limited purposes required by <br /> Subcontractor, Supplier, or other individual or entity paragraph 6. 17.E. <br /> directly or indirectly employed by any of them). <br /> CONTRACTOR's duties and responsibilities for safety and B. CONTRACTOR shall also submit Samples to <br /> for protection of the Work shall continue until such time as ENGINEER for review and approval in accordance with the <br /> all the Work is completed and ENGINEER has issued a acceptable schedule of Shop Drawings and Sample <br /> notice to OWNER and CONTRACTOR in accordance with submittals. Each Sample will be identified clearly as to <br /> paragraph 14.07.13 that the Work is acceptable (except as material, Supplier, pertinent data such as catalog numbers, <br /> otherwise expressly provided in connection with Substantial and the use for which intended and otherwise as ENGI- <br /> Cornpletion). NEER may require to enable ENGINEER to review the <br /> submittal for the limited purposes required by paragraph <br /> 6. 14 Safety Representative 6. 17.E. The numbers of each Sample to be submitted will <br /> be as specified in the Specifications. <br /> A. CONTRACTOR shall designate a qualified and <br /> experienced safety representative at the Site whose duties C. Where a Shop Drawing or Sample is required by <br /> and responsibilities shall be the prevention of accidents and the Contract Documents or the schedule of Shop Drawings <br /> the maintaining and supervising of safety precautions and and Sample submittals acceptable to ENGINEER as <br /> programs. required by paragraph 2.07, any related Work performed <br /> prior to ENGINEER's review and approval of the pertinent <br /> 6. 15 Hazard Communication Programs submittal will be at the sole expense and responsibility of <br /> CONTRACTOR. <br /> A. CONTRACTOR shall be responsible for coordi- <br /> nating any exchange of material safety data sheets or other D. Submittal Procedures <br /> hazard communication information required to be made <br /> available to or exchanged between or among employers at 1 . Before submitting each Shop Drawing or <br /> the Site in accordance with Laws or Regulations. Sample, CONTRACTOR shall have determined and <br /> verified: <br /> 6. 16 Emergencies <br /> a. all field measurements, quantities, dimen- <br /> A. In emergencies affecting the safety or protection of sions, specified performance criteria, installation <br /> persons or the Work or property at the Site or adjacent requirements, materials, catalog numbers, and <br /> thereto, CONTRACTOR is obligated to act to prevent similar information with respect thereto; <br /> threatened damage, injury, or loss. CONTRACTOR shall <br /> 00700 - 25 <br />