My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR. Delays attributable to and within the <br /> d. no fee shall be payable on the basis of control of a Subcontractor or Supplier shall be deemed to be <br /> costs itemized undef paFagEaphs 11 -01A.4, delays within the control of CONTRACTOR. <br /> 11 .01 .A.5, and 11 .01 .13, <br /> 101B <br /> 12.05 Delays Beyond OWNER ,s and CONTRACTOR 's <br /> A. the Am- ..t of credit to be alle . zed by Control <br /> rrnwrrn A CTnn t,, OWNER c_ a ch"..,. <br /> which _"sin`s in " net de,._ease in cost will be th„ A. Where CONTRACTOR is prevented from <br /> int of the aetiaal net a ",._, ase in co plus-a completing any part of the Work within the Contract Times <br /> deduction in CONTRACTOR's eel b an (or Milestones) due to delay beyond the control of both <br /> amaupA equal to five peFeent of such net OWNER and CONTRACTOR, an extension of the <br /> deeeeasend Contract Times (or Milestones) in an amount equal to the <br /> time lost due to such delay shall be CONTRACTOR's sole <br /> `. when both addiliOHS and CfRdiand exclusive remedy for such delay. <br /> volved in any ene A <br /> the adjustment <br /> _ fee shall be oemp -tea on-the 12.06 Delay Damages <br /> basisnet ., lee in . ..... .. .0. e..`a <br /> graphs 1 2 0 ' C o . ........ <br /> = t3.ff e_gh __i Paragraphs 12.06.A and 12.06 B have been deleted and <br /> sive: replaced with a new paragraph. See the Supplementary <br /> Conditions. <br /> 12.02 Change of Contract Times A In Be . m- -t shall 03AWER of E'.�be, <br /> liable to GOP4RALCTOR, any Sabeentfaeior, any Siipplier-, <br /> A. The Contract Times (or Milestones) may only be OF any other _ef e_ of organization, . ._ any SURtyc . ,,f <br /> changed by a Change Order or by a Written Amendment. <br /> Any Claim for an adjustment in the Contract Times (or of FeStdtiHg <br /> Milestones) shall be based on written notice submitted by <br /> the party making the claim to the ENGINEER and the other 1 . delays i::::ea by of within the eent..a1 <br /> party to the Contract in accordance with the provisions of !'^"'" RAG OR; e <br /> paragraph 10.05. <br /> 2. delays beyend—tthe e,..o el of _both <br /> B. Any adjustment of the Contract Times (or OWNER and '�^_.:RAGTOn a.^hi ing but not <br /> Milestones) covered by a Change Order or of any Claim for <br /> an adjustment in the Contract Times (or Milestones) will be _anditions, act of God, o omit„ 1 et b utility <br /> _ T-n�g,«� by <br /> determined in accordance with the provisions of this owqieFs of _ -___ coaaaetws _.,_f rming oth .- wo <br /> Article 12. as eeRt ...._.1"ted b A Ft ele 7 <br /> 12.03 Delays Beyond CONTRACTOR 's Control n Nothing in this .."_.. ._.._h 12.06 h"_s _ _h <br /> " <br /> pA to this Article 12 te compensate <br /> A. Where CONTRACTOR is prevented from CONTn CTOR a,e <br /> Ato delay, ifiterferenee, edisruption <br /> completing any part of the Work within the Contract Times a:_-edy attributable to ee`ons or imetions of 0 .' <br /> (or Milestones) due to delay beyond the control of Ryo e or whorn 0AWER is responsible. <br /> CONTRACTOR, the Contract Times (or Milestones) will <br /> be extended in an amount equal to the time lost due to such <br /> delay if a Claim is made therefor as provided in paragraph ARTICLE 13 - TESTS AND INSPECTIONS; <br /> 12 .02 .A. Delays beyond the control of CONTRACTOR CORRECTION, REMOVAL OR ACCEPTANCE OF <br /> shall include, but not be limited to, acts or neglect by DEFECTIVE WORK <br /> OWNER, acts or neglect of utility owners or other <br /> contractors performing other work as contemplated by <br /> Article 7, fires, floods, epidemics, abnormal weather 13 .01 Notice of Defects <br /> conditions, or acts of God. <br /> A. Prompt notice of all defective Work of which <br /> 12 .04 Delays Within CONTRACTOR 's Control OWNER or ENGINEER has actual knowledge will be <br /> given to CONTRACTOR. All defective Work may be <br /> A. The Contract Times (or Milestones) will not be rejected, corrected, or accepted as provided in this <br /> extended due to delays within the control of Article 13 . <br /> 00700 - 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.