Laserfiche WebLink
prior to CONTRACTOR's purchase thereof for <br /> 13 .02 Access to Work incorporation in the Work. Such inspections, tests, or <br /> approvals shall be performed by organizations acceptable to <br /> A. OWNER, ENGINEER, ENGINEER's Con- OWNER and ENGINEER. <br /> sultants, other representatives and personnel of OWNER, <br /> independent testing laboratories, and governmental agencies E. If any Work (or the work of others) that is to be <br /> with jurisdictional interests will have access to the Site and inspected, tested, or approved is covered by CONTRAC- <br /> the Work at reasonable times for their observation, TOR without written concurrence of ENGINEER, it must, <br /> inspecting, and testing. CONTRACTOR shall provide if requested by ENGINEER, be uncovered for observation. <br /> them proper and safe conditions for such access and advise <br /> them of CONTRACTOR's Site safety procedures and F. Uncovering Work as provided in paragraph <br /> programs so that they may comply therewith as applicable. 13 .03 .E shall be at CONTRACTOR's expense unless CON- <br /> TRACTOR has given ENGINEER timely notice of <br /> 13 .03 Tests and Inspections CONTRACTOR's intention to cover the same and ENGI- <br /> NEER has not acted with reasonable promptness in <br /> A. CONTRACTOR shall give ENGINEER timely response to such notice. <br /> notice of readiness of the Work for all required inspections, <br /> tests, or approvals and shall cooperate with inspection and 13 .04 Uncovering Work <br /> testing personnel to facilitate required inspections or tests. <br /> A. If any Work is covered contrary to the written <br /> Paragraph 13.03.B has been deleted and replaced with a request of ENGINEER, it must, if requested by ENGI- <br /> new paragraph. See the Supplementary Conditions. NEER, be uncovered for ENGINEER's observation and <br /> B. 03r?4srnn shall ...�..t,.y and pay c_ the service v <br /> •••r•�, •--•.. vu, -..• .... ,. • . .. �,� replaced at CONTRACTOR'S expense. <br /> tests, of approvals 'ee"'" d by the Cortiac. Documents Parts of the last two sentences of paragraph 13.04.B <br /> eiweptt have been deleted. <br /> B . If ENGINEER considers it necessary or advisable <br /> 1 . for inspections,test;,,of appra*a s that covered Work be observed by ENGINEER or inspect- <br /> .efed 1.. . ....-..,......d... 13 0q P and 1 ] n'1 ll 6 1 <br /> o • .- � �, r--..b-..r•W • � . �� . �. u.... . �...�.-� .F.o., ed or tested by others, CONTRACTOR, at ENGINEER'S <br /> request, shall uncover, expose, or otherwise make available <br /> 2. that eests insuEred=in •i <br /> tonne ia--..,.•- �'h for observation, inspection, or testing as ENGINEER may <br /> require, that portion of the Work in question, furnishing all <br /> 13 .04 .13 shall be paid as pFevided in said paFagfaph necessary labor, material, and equipment. If it is found that <br /> 13 .04 .9;. Q,...d"..d such Work is defective, CONTRACTOR shall pay all <br /> Claims, costs, losses, and damages (including but not <br /> 3. „ ather•:.:se specifiea4ly . ayided in .r.., limited to all fees and charges of engineers, architects, <br /> attorneys, and other professionals and all court or arbitration <br /> or other dispute resolution costs) arising out of or relating to <br /> such uncovering, exposure, observation, inspection, and <br /> Paragraph 13.03.0 has been deleted in its entirety. testing, and of satisfactory replacement or reconstruction <br /> (including but not limited to all costs of repair or <br /> replacement of work of others); and OWNER shall be <br /> to be nspe-tee', tested c: approved by an e._.rdafter entitled to an appropriate decrease in the Contract Price. If <br /> representative of _ieh public bad`• GONT `' shall the parties are unable to agree as to the amount thereof, <br /> aSsurno fill ' "" for ""angina and obtaining sudh OWNER may make a Claim therefor as provided in <br /> inspeetions, tests,. __ approval, ray all costs�:a,ec.,o„ paragraph 10.05. If, however, such Work is not found to be <br /> thrreM4th a:d fiHnich ENGP EER the .. <br /> re^ :_. . <br /> y�a o ee.._.c <br /> .c� defective, CONTRACTOR shall be allowed-an-i��-�.ease- ir, <br /> tho rte,.. `mot _: <br /> n ,.e ,n�,.e o an extension of the Contract Times (or <br /> Milestones), or—both, directly attributable to such <br /> D. CONTRACTOR shall be responsible for uncovering, exposure, observation, inspection, testing, <br /> arranging and obtaining and shall pay all costs in connection replacement, and reconstruction. If the parties are unable to <br /> with any inspections, tests, or approvals required for agree as to the-arno� extent thereof, CONTRACTOR <br /> OWNER's and ENGINEER's acceptance of materials or may make a Claim therefor as provided in paragraph 10.05 . <br /> equipment to be incorporated in the Work; or acceptance of <br /> materials, mix designs, or equipment submitted for approval <br /> 00700 - 37 <br />