Laserfiche WebLink
B . Develop and make all detail surveys and measurements needed for construction <br /> including but not limited to , slope stakes , batter boards , piling layouts and all <br /> other working lines , elevations and cut sheets . <br /> C . Keep a transit and leveling instrument on the site at all times and a skilled <br /> instrument man available whenever necessary for layout of the Work. <br /> D . Provide all material required for benchmarks , control points , batter boards , grade <br /> stakes , and other items . <br /> E . Be solely responsible for all locations , dimensions and elevations . No data other <br /> than written orders of the ENGINEER shall justify departure from the dimensions <br /> and elevations required by the Drawings . <br /> F . Safeguard all points , stakes, grademarks , monuments and benchmarks made or <br /> established on the Work, and reestablish same , if disturbed . Rectify all Work <br /> improperly installed because of not maintaining , not protecting or removing <br /> without authorization such established points , stakes , marks and monuments. <br /> G . When requested by the ENGINEER , provide such facilities and assistance as <br /> may be necessary for the ENGINEER to check line and grade points placed by <br /> the CONTRACTOR . Do no excavation or embankment work until all <br /> cross-sectioning necessary for determining pay quantities has been completed <br /> and checked by the ENGINEER. <br /> H . The cost of performing engineering and layout work described above shall be <br /> included in the contract unit prices for the various items of work to which it is <br /> incidental . No separate payment will be made for surveying or engineering . <br /> 1 . 2 SURVEY WORK AND QUALIFICATIONS OF SURVEYOR <br /> A. Prior to commencing work, the CONTRACTOR shall satisfy himself as to the <br /> accuracy of all survey and existing site information as indicated in the Contract <br /> Documents . Immediately notify the ENGINEER upon discovery of any errors , <br /> inaccuracies or omissions in the survey data . The commencing of any of the work <br /> by the CONTRACTOR shall be held as the CONTRACTOR's acceptance that all <br /> survey or existing site information is correct and accurate , without any reasonably <br /> inferable errors , inaccuracies or omissions . <br /> B . The CONTRACTOR shall carefully preserve all control stakes , benchmarks , <br /> sections and / or land corners , reference points and property corners and will be <br /> responsible for any mistake or loss of time caused by their unnecessary loss or <br /> disturbance . If the loss or disturbance of the stakes or marks cause a delay in the <br /> Work, the CONTRACTOR shall have no claim for damages or extension of time. <br /> Control stakes , benchmarks , section and / or land corners , reference points and <br /> property corners disturbed by the CONTRACTOR's work shall be replaced by a <br /> Florida Registered Land Surveyor and Mapper, at the CONTRACTOR's expense . <br /> In the event the Owner must provide the services of the Florida Registered <br /> Surveyor and Mapper to perform this replacement work, the cost of the surveying <br /> services will be deducted from any sums due the CONTRACTOR for the work <br /> performed under this Contract. <br /> GENERAL REQUIREMENTS <br /> GR-3 <br /> F:\Public WodcslCapital Projects\Oslo Road\Oslo Widening, Old Dixie to 27th Ave\CONTRACT DOCUMENT\DIVISION 1 - General <br /> Requirements.doc <br /> 5/23/01 <br />