Laserfiche WebLink
1 .2 RESPONSIBILITY FOR INSPECTIONS AND TESTS <br /> A . Residual OWNER Responsibility: The OWNER will employ and pay for the <br /> services of independent testing laboratories to perform those required <br /> inspections and tests . <br /> B . CONTRACTORS General Responsibility: No failure of test agencies , whether <br /> engaged by the OWNER or CONTRACTOR , to perform adequate inspections of <br /> tests or to properly analyze or report results , shall relieve the CONTRACTOR of <br /> responsibility for the fulfillment of the requirements of the Contract Documents . It <br /> is recognized that the required inspection and testing program is intended to <br /> assist the CONTRACTOR , OWNER , ENGINEER, and governing authorities in <br /> the nominal determination of probable compliance with requirements for certain <br /> crucial elements of work. The program is not intended to limit the <br /> CONTRACTOR in his regular quality control program , as needed for general <br /> assurance of compliance. <br /> 1 . 3 QUALITY ASSURANCE <br /> A. General Workmanship Standards : It is a requirement that each category of <br /> tradesman or installer performing the work be pre-qualified , to the extent of being <br /> familiar with the applicable and recognized quality standards for his category of work, <br /> and being capable of workmanship complying with those standards. <br /> 1 .4 PRODUCT DELIVERY-STORAGE-HANDLING <br /> Handle, store and protect materials and products , including fabricated <br /> components , by methods and means which will prevent damage , deterioration and <br /> losses (and resulting delays), thereby ensuring highest quality results as the <br /> performance of the work progresses . Control delivery schedules so as to minimize <br /> unnecessary long-term storage at the project site prior to installation . <br /> 1 . 5 PROJECT PHOTOGRAPHS/VIDEOS <br /> A. The CONTRACTOR shall make provisions , at his expense , for video tapes of all work <br /> areas just prior to construction , and for unusual conditions during construction . The <br /> videos shall show pertinent physical features along the line of construction . The <br /> purpose of the videos is to determine any damage to private or public property during <br /> construction . <br /> B . Pre-Construction Video : <br /> 1 . Contractor shall provide the Owner with a video record and one copy of the <br /> existing conditions prior to construction . This video shall be a standard VHS <br /> cassette format, and shall be narrated . <br /> 2 . The video shall include , but not be limited to , the following items shown in a clear <br /> manner: <br /> 1 ) All existing features within the right-of-way. <br /> 2 ) All existing features within the temporary construction easement. <br /> GENERAL REQUIREMENTS <br /> GR-6 <br /> FAPublic Works\Capital Projects\Oslo Road\Oslo Widening, Old Dixie to 27th Ave\CONTRACT DOCUMENT\DIVIS ION 1 - General <br /> Requirements.doc <br /> 5/23/01 <br />