Laserfiche WebLink
3 ) All existing features within permanent easements . <br /> 4) All existing features adjacent to any construction . <br /> 3 . Detail of the video shall be such that the following examples shall be clear and <br /> visible : <br /> 1 ) Cracks in walls . <br /> 2 ) Condition of fencing . <br /> 3 ) Condition of planted areas and types of vegetation . <br /> 4 ) Condition of sodded areas . <br /> 5 ) Conditions of sprinkler systems and associated controls and wiring . <br /> 6) Condition of signs . <br /> 7) Conditions of lighting and associated wiring . <br /> 8) Significant detail of any pre-existing damages physical features shall be <br /> shown . The coverage of the video should include the limits of effects of <br /> the use of vibratory rollers . <br /> 9 ) This video record shall be presented to the Owner within 30 days of the <br /> Notice to Proceed . A copy shall be kept in the Contractor' s field office . <br /> 10) Payment — No additional payment will be made for this work . <br /> SECTION 01220 PROGRESS MEETINGS <br /> 1 . 1 SCOPE <br /> A. Date and Time : <br /> 1 . Regular Meetings : As mutually agreed upon by ENGINEER and <br /> CONTRACTOR . <br /> 2 . Other Meetings : On call . <br /> B . Place: CONTRACTOR' S office at Project site or other mutually agreed upon <br /> location . <br /> C . ENGINEER shall prepare agenda , preside at meetings , and prepare and distribute <br /> a transcript of proceedings to all parties . <br /> D . CONTRACTOR shall provide data required and be prepared to discuss all items <br /> on agenda . <br /> 1 . 2 MINIMUM ATTENDANCE <br /> A. CONTRACTOR <br /> B . SUBCONTRACTOR: <br /> When needed for the discussion of a particular agenda item , CONTRACTOR shall <br /> require representatives of Subcontractors or suppliers to attend a meeting . <br /> GENERAL REQUIREMENTS <br /> GR-7 <br /> F:1Public Workslcapital Projects\Oslo Road\Oslo Widening, Old Dixie to 27th Ave1CONTRACT DOCUMENT\DIVISION 1 - General <br /> Requirements .doc <br /> 5/23/01 <br />