Laserfiche WebLink
within any right-of-way, platted or prescriptive . Acceptable materials , <br /> equipment ,and methods shall be used for such restoration . <br /> F . Thoroughly clean all materials and equipment installed and on completion of <br /> the work, deliver the facilities undamaged and in fresh and new-appearing <br /> condition . <br /> G . It is the intent of the Specifications to place the responsibility on the <br /> CONTRACTOR to restore to their original condition all items disturbed , <br /> destroyed , or damaged during construction . Particular attention will be <br /> placed on restoration of canals to equal or better condition than prior to <br /> construction . <br /> H . When finished surfaces require cleaning with cleaning materials , use only <br /> those cleaning materials which will not create hazards to health or property <br /> and which will not damage the surfaces . Use cleaning materials only on <br /> those surfaces recommended by the manufacturer. Follow the <br /> manufacturer's directions and recommendations at all times . <br /> I . Keep the amount of dust produced during construction activities to a <br /> minimum . At CONTRACTOR' s expense , spray water or other dust control <br /> agents over the areas , which are producing the dust. Schedule construction <br /> operations so that dust and other contaminants will not fall on wet or newly <br /> coated surfaces . <br /> 1 . 3 SITE CLEANUP AND RESTORATION <br /> Prior to final completion , the OWNER, ENGINEER, INDIAN RIVER FARMS <br /> WATER CONTROL DISTRICT, and CONTRACTOR shall review the site with <br /> regards to site cleanup and restoration . Clean and/or restore all items determined <br /> to be unsatisfactory by the OWNER or ENGINEER, at no additional expense. <br /> SECTION 01720 RECORD DOCUMENTS <br /> 1 . 1 GENERAL <br /> A. Maintain and provide the ENGINEER with record documents as specified below, <br /> except where otherwise specified or modified in Divisions 2- 16 or the <br /> Supplementary Conditions . <br /> B . Maintenance of Documents : <br /> 1 . Maintain in CONTRACTOR's field office in clean , dry , legible condition <br /> complete sets of the following : Drawings , Specifications , Addenda , approved <br /> Shop Drawings , samples , photographs , Change Orders, other modifications <br /> of Contract Documents , test records , survey data , Field Orders , and all other <br /> documents pertinent to CONTRACTOR'S Work. <br /> 2 . Provide files and racks for proper storage and easy access . <br /> 3 . Make documents available at all times for inspection by ENGINEER and <br /> OWNER . <br /> GENERAL REQUIREMENTS <br /> GR-22 <br /> F:\Public Works\Capital Projects\Oslo Road\Oslo Widening, Old Dixie to 27th Ave\CONTRACT DOCUMENT\DIVISION 1 - General <br /> Requirements.doc <br /> 5/23/01 <br />