My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reimburse Owner for the charges of Engineer and Engineer' s consultants for <br /> evaluating each proposed substitute . <br /> J . Substitute materials or equipment may be proposed for acceptance in accordance <br /> with this Section . In the event that substitute materials or equipment are used and <br /> are less costly than the originally specified material or equipment , than the net <br /> difference in cost shall benefit the Owner and CONTRACTOR in equal proportions . <br /> This cost difference shall not be reduced by any failure of the CONTRACTOR to <br /> base his bid on the named materials or equipment. <br /> SECTION 01710 SITE CLEANUP AND RESTORATION <br /> 1 . 1 SCOPE <br /> Furnish all labor, equipment, appliances , and materials required or necessary to <br /> clean up and restore the site after the construction is completed . <br /> 1 . 2 REQUIREMENTS <br /> A . During the progress of the project, keep the work and the adjacent areas <br /> affected thereby in a neat and orderly condition . Remove all rubbish , <br /> surplus materials , and unused construction equipment . Repair all damage <br /> so that the public and property owners will be inconvenienced as little as <br /> possible . <br /> B . Provide onsite containers for the collection of waste materials , debris , and <br /> rubbish and empty such containers in a legal manner when they become <br /> full . <br /> C . Where material or debris has been deposited in watercourses , ditches , <br /> gutters , drains, or catch-basins as a result of the CONTRACTOR's <br /> operations , such material or debris shall be entirely removed and <br /> satisfactorily disposed of during the progress of the work , and the ditches , <br /> channels, drains , etc . , shall be kept clean and open at all times . <br /> D . Before the completion of the project, unless otherwise especially directed or <br /> permitted in writing : <br /> 1 . Tear down and remove all temporary buildings and structures ; <br /> 2 . Remove all temporary works , tools , and machinery, or other <br /> construction equipment furnished ; <br /> 3 . Remove all rubbish from any grounds occupied ; and <br /> 4 . Leave the roads , all parts of the premises, and adjacent property <br /> affected by construction operations , in a neat and satisfactory <br /> condition . <br /> E . Restore or replace any public or private property damaged by construction <br /> work, equipment, or employees , to a condition at least equal to that existing <br /> immediately prior to the beginning of the operations . To this end , the <br /> CONTRACTOR shall restore all highway, roadside , and landscaping work <br /> GENERAL REQUIREMENTS <br /> GR-21 <br /> FAPublic Works\Capital Projects\Oslo Road\Oslo Widening , Old Dixie to 27th Ave\CONTRACT DOCUMENTDIVISION 1 - General <br /> Requirements .doc <br /> 5/23/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.