Laserfiche WebLink
2 . It will delay completion of the Work, or the work of other contractors . <br /> 3 . It is indicated or implied on a Shop Drawing and is not accompanied by a <br /> formal Request for Substitution from CONTRACTOR . <br /> E . If the ENGINEER determines that a proposed substitute is not equal to that <br /> specified , furnish the product, manufacturer, or method specified at no additional <br /> cost to OWNER . <br /> F . Approval of a substitution will not relieve CONTRACTOR from the requirement for <br /> submission of Shop Drawings as set forth in the Contract Documents . <br /> G . The procedure for review by Engineer will include the following : <br /> 1 . Requests for review of substitute items of material and equipment will <br /> not be accepted by Engineer from anyone other than CONTRACTOR. <br /> 2 . Upon receipt of an application for review of a substitution , Engineer will <br /> determine whether the review will be more extensive than a normal shop <br /> drawing review for the specified item . <br /> 3 . If the substitution will not require a more extensive review, Engineer will <br /> proceed with the review without additional cost to CONTRACTOR . <br /> 4 . If the substitution requires a more extensive review, Engineer will proceed <br /> with the review only after CONTRACTOR has agreed to reimburse Owner <br /> for the review cost. <br /> 5 . Engineer may require CONTRACTOR to furnish at CONTRACTOR's <br /> expense additional data about the proposed substitute . <br /> H . Any redesign of structural members shall be performed by, and the plans signed <br /> and sealed by, a Professional Engineer registered in the State of Florida . The <br /> redesign shall be at the CONTRACTOR's expense . Any redesign will require an <br /> extensive review by the Engineer. The CONTRACTOR must agree to reimburse <br /> the Owner for the review cost prior to the Owner' s Engineer proceeding with the <br /> design review. The ENGINEER's hourly rate for review is $ 125 per hour. The <br /> ENGINEER's estimated cost of review shall be provided to the CONTRACTOR <br /> prior to proceeding with the review to allow the CONTRACTOR the opportunity to <br /> rescind the request. <br /> I . Engineer will be allowed a reasonable time within which to evaluate each proposed <br /> substitution . Engineer will be the sole judge of acceptability and shall have the <br /> right to deny use of any proposed substitution . The CONTRACTOR shall not <br /> order, install , or utilize any substitution without either an executed Change Order or <br /> Engineer' s notation on the reviewed shop drawing . Owner may require <br /> CONTRACTOR to furnish at CONTRACTOR Is expense a special manufacturer' s <br /> performance guarantee (s ) or other surety with respect to any substitute and an <br /> indemnification by the CONTRACTOR . ENGINEER will record time required by <br /> Engineer and Engineer's consultants in evaluating substitutions proposed by <br /> CONTRACTOR and in making changes in the Contract Documents occasioned <br /> thereby. Whether or not a proposed substitute is sued , CONTRACTOR shall <br /> GENERAL REQUIREMENTS <br /> GR-20 <br /> F1Public Works\Capital Projects\Oslo Road\Oslo Widening , Old Dixie to 27th Ave\CONTRACT DOCUMENT\DIVISION 1 - General <br /> Requirements .doc <br /> 5/23/01 <br />