Laserfiche WebLink
E . Where more than one choice is available as a CONTRACTOR's option , select <br /> product which is compatible with other products already selected or specified . <br /> 1 . 3 SUBSTITUTIONS <br /> A. During a period of 15 days after date of commencement of Contract Time , <br /> ENGINEER will consider written requests from CONTRACTOR for substitution of <br /> products or manufacturers , and construction methods ( if specified ) . <br /> 1 . After end of specified period , requests will be considered only in case of <br /> unavailability of product or other conditions beyond control of <br /> CONTRACTOR . <br /> B . Submit 5 copies of Request for Substitution . Submit a separate request for each <br /> substitution . In addition to requirements set forth in Article 6 . 7 of General Condi- <br /> tions , include in the request the following : <br /> 1 . For products or manufacturers : <br /> a . Product identification , including manufacturer's name and address . <br /> b . Manufacturer's literature with product description , performance and <br /> test data , and reference standards. <br /> c . Samples, if appropriate . <br /> d . Name and address of similar projects on which product was used , <br /> and date of installation . <br /> 2 . For construction methods (if specified ): <br /> a . Detailed description of proposed method . <br /> b . Drawings illustrating method . <br /> 3 . Such other data as the ENGINEER may require to establish that the <br /> proposed substitution is equal to the product , manufacturer or method <br /> specified . <br /> C . In making Request for Substitution , CONTRACTOR represents that: <br /> 1 . CONTRACTOR has investigated proposed substitution , and determined <br /> that it is equal to or superior in all respects to the product , manufacturer or <br /> method specified . <br /> 2 . CONTRACTOR will provide the same or better guarantees or warranties <br /> for proposed substitution as for product , manufacturer, or method <br /> specified . <br /> 3 . CONTRACTOR waives all claims for additional costs or extension of time <br /> related to a proposed substitution that subsequently may become <br /> apparent. <br /> D . A proposed substitution will not be accepted if: <br /> 1 . Acceptance will require changes in the design concept or a substantial <br /> revision of the Contract Documents . <br /> GENERAL REQUIREMENTS <br /> GR- 19 <br /> F:\Public Works\CapitaI Projects\Oslo Road\Oslo Widening, Old Dixie to 27th Ave\CONTRACT DOCUMENT\DIVISION 1 - General <br /> Requirements .doc <br /> 5/23/01 <br />