My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Keep materials and equipment neatly and compactly stored in locations that will <br /> cause a minimum of inconvenience to other contractors , public travel , adjoining <br /> owners , tenants and occupants . Arrange storage in a manner to provide easy <br /> access for inspection . <br /> C . Areas available on the construction site for storage of material and equipment <br /> shall be as shown or approved by the ENGINEER. <br /> D . Store materials and equipment which are to become the property of the OWNER <br /> to facilitate their inspection and insure preservation of the quality and fitness of <br /> the Work, including proper protection against damage by extreme temperatures <br /> and moisture . <br /> E . Do not use lawns , grass plots or other private property for storage purposes <br /> without written permission of the OWNER or other person in possession or <br /> control of such premises . <br /> F . CONTRACTOR shall be fully responsible for loss or damage to stored materials <br /> and equipment. <br /> G . Do not open manufacturers containers until time of installation unless <br /> recommended by the manufacturer or otherwise specified . <br /> H . When appropriate store materials on wood blocking so there is no contact with <br /> the ground . <br /> SECTION 01630 SUBSTITUTIONS <br /> 1 . 1 GENERAL <br /> A. Requests for review of a substitution shall conform to the requirements of <br /> Article 6 . 05 , "Substitutes and Or-Equals ," of the General Conditions , and shall <br /> contain complete data substantiating compliance of the proposed substitution with <br /> the Contract Documents . <br /> 1 . 2 CONTRACTOR'S OPTIONS <br /> A. For materials or equipment (hereinafter products) specified only by reference <br /> standard , select product meeting that standard by any manufacturer, fabricator, <br /> supplier or distributor (hereinafter manufacturer) . To the maximum extent <br /> possible , provide products of the same generic kind from a single source . <br /> B . For products specified by naming several products or manufacturers , select any <br /> one of the products or manufacturers named which complies with Specifications . <br /> C . For products specified by naming one or more products or manufacturers and <br /> stating "or equivalent , " submit a request for a substitution for any product or <br /> manufacturer which is not specifically named . <br /> D . For products specified by naming only one product or manufacturer and followed <br /> by words indicating that no substitution is permitted , there is no option and no sub- <br /> stitution will be allowed . <br /> GENERAL REQUIREMENTS <br /> GR- 18 <br /> F:\Public Works\Capital Projects\Oslo Road\Oslo Widening, Old Dixie to 27th Ave\CONTRACT DOCUMENT\DIVISION 1 - General <br /> Requirements.doc <br /> 5/23/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.