Laserfiche WebLink
D . Do not have products delivered to site until required storage facilities have been <br /> provided . <br /> E . Have products delivered to site in manufacturer's original , unopened , labeled <br /> containers . Keep ENGINEER informed of delivery of all equipment to be <br /> incorporated in the Work. <br /> F . Partial deliveries of component parts of equipment shall be clearly marked to <br /> identify the equipment, to permit easy accumulation of parts , and to facilitate <br /> assembly. <br /> G . Immediately on delivery, inspect shipment to assure : <br /> 1 . Product complies with requirements of Contract Documents and reviewed <br /> submittals . <br /> 2 . Quantities are correct . <br /> 3 . Containers and packages are intact, labels are legible . <br /> 4 . Products are properly protected and undamaged . <br /> 1 .3 PRODUCT HANDLING <br /> A. Provide equipment and personnel necessary to handle products , including those <br /> provided by OWNER , by methods to prevent soiling or damage to products or <br /> packaging . <br /> B . Provide additional protection during handling as necessary to prevent scraping , <br /> marring or otherwise damaging products or surrounding surfaces . <br /> C . Handle products by methods to prevent bending or overstressing . <br /> D . Lift heavy components only at designated lifting points . <br /> E . Materials and equipment shall at all times be handled in a safe manner and as <br /> recommended by manufacturer or supplier so that no damage will occur to them . <br /> Do not drop, roll or skid products off delivery vehicles . Hand carry or use suitable <br /> materials handling equipment. <br /> SECTION 01611 STORAGE OF MATERIAL AND <br /> EQUIPMENT <br /> 1 . 1 GENERAL <br /> A. Store and protect materials and equipment in accordance with manufacturer's <br /> recommendations and requirements of Specifications . <br /> B . Make all arrangements and provisions necessary for the storage of materials and <br /> equipment. Place all excavated materials , construction equipment , and materials <br /> and equipment to be incorporated into the Work, so as not to injure any part of the <br /> Work or existing facilities , and so that free access can be had at all times to all <br /> parts of the Work and to all public utility installations in the vicinity of the Work. <br /> GENERAL REQUIREMENTS <br /> GR- 17 <br /> FAPublic Works\Capital Projects\Oslo Road\Oslo Widening, Old Dixie to 27th Ave\CONTRACT DOCUMENTUIVISION 1 - General <br /> Requirements.doc <br /> 5/23/01 <br />