Laserfiche WebLink
C . Off-duty police or sheriff deputies shall be used during various maintenance of <br /> traffic operations including : signalization adjustments and installations and lane <br /> closures of duration greater than 10 minutes . <br /> D . Compensation : All compensation for maintenance of traffic, other than Temporary <br /> Pavement , Traffic Control Officer, Business Signs , Concrete Barrier Wall <br /> (Temporary) , Barricade (Temporary) Type II , Barricade (Temporary) Type III , <br /> Advance Warning Arrow Panel , Changeable Variable Message Sign (Temporary), <br /> Signal Temporary Traffic Control ( Portable), Signal Temporary Traffic Control <br /> ( Fixed ), Temporary CAP Pipe Culvert ( 18 " SS ), Temporary Shoring (Temporary <br /> Sheeting ) and Temporary Pumping System ( 10 ,000 GPM ) delineated within the <br /> plans , shall be lump sum . This shall include all items and services necessary for <br /> the safe maintenance of traffic within the project limits . This shall include , but not <br /> be limited to , flaggers , construction and advisory signing , detours , embankment, <br /> base material , asphaltic concrete , striping , maintenance of pavement, asphaltic <br /> concrete curb, stormwater removal , temporary drainage structures and pipe , <br /> commercial material for driveway maintenance , high intensity flashing lights , <br /> removable and temporary pavement markings , and temporary reflective pavement <br /> markers , for maintenance of traffic . <br /> E . Non-Compliance : Should the Owner or Engineer determine that traffic within the <br /> project is not being maintained in accordance with the approved traffic control plan <br /> or presents a public safety concern , the contractor shall have until the end of the <br /> working day, in which notification is given , to take action to modify the maintenance <br /> of traffic. Should the contractor fail to make such modification the Owner shall <br /> have the option to fine the Contractor $400 per day until remedied . <br /> F . Contractor's Maintenance of Traffic Plan shall maintain two-way vehicular traffic on <br /> Oslo Road at all times . The Contractor shall maintain one lane of traffic at all times <br /> during Oslo Road cross drain culvert construction . Owner shall have option to fine <br /> the Contractor $ 1 ,000 . 00 per day for Maintenance of Traffic Plan non -compliance . <br /> G . Payment shall be made under: <br /> Item No . 102- 1 - Maintenance of Traffic - Lump Sum <br /> Item No . 102- 1 - 1 — Temporary Pavement — Square Yard <br /> Item No . 102- 14 — Traffic Control Officer — Man Hour <br /> Item No . 102-61 — Business Signs — Each <br /> Item No . 102-71 - 11 — Concrete Barrier Wall (Temporary) - Linear Foot <br /> Item No . 102-74- 1 — Barricade (Temporary) Type II — Each Day <br /> Item No . 102-74-2 — Barricade (Temporary) Type III — Each Day <br /> Item No . 102-76 — Advance Warning Arrow Panel — Each Day <br /> Item No. 102-99 — Changeable Variable Message Sign (Temporary) — Each Day <br /> Item No . 102- 104- 1 — Signal Temporary Traffic Control ( Portable) — Each Day <br /> Item No . 102- 104-2 — Signal Temporary Traffic Control ( Fixed ) — Each Day <br /> Item No . 430-171 - 125C — Temporary CAP Pipe Culvert ( 18" SS ) - Linear Foot <br /> Item No . 455- 133-2 — Temporary Shoring (Temporary Sheeting ) - Lump Sum <br /> Item No . 730-88 — Temporary Pumping System ( 10 , 000 GPM ) - Each <br /> GENERAL PROVISIONS <br /> TP-3 <br /> CADocuments and SettingsVeresaa\Loral Settings\Temporary Internet Files\OLKF3\DIVISION 2 - Technical Provisions (Oslo Road <br /> Phase 1).doc <br />