Laserfiche WebLink
SECTION 00104 EROSION AND WATER POLLUTION <br /> CONTROL <br /> 1 . 1 The Contractor shall install erosion and water pollution control methods in accordance <br /> with FDOT Index 100 , 102 , 103 and 104 , Standard Specifications Section 104 , and all <br /> permit requirements . The Contractor is responsible for meeting appropriate federal , <br /> state , and local regulations and water quality standards , such as turbidity. All <br /> disturbed areas will be replanted with approved vegetation cover (either final or <br /> temporary) within 30 days of final grading . <br /> A . Preconstruction Conference : At the preconstruction conference the Contractor <br /> shall present , in written form , his plans and schedules for prevention , control , and <br /> abatement of erosion and water pollution . <br /> B . Canals : Floating turbidity barriers shall be installed in all permanent water course <br /> in a manner so as not to act as a dam . Barriers shall be located at distance of no <br /> greater than 25 feet downstream from the last point of construction . <br /> C . Silt Fences : Silt fences shall be installed to prevent silt and erosion from leaving <br /> the project limits particularly adjacent to wetlands , roadside ditches or existing <br /> bodies of water. <br /> D . Storm Sewer System : The Contractor shall protect the storm sewer system from <br /> erosion and sedimentation during construction . This may include the use of baled <br /> hay, silt fences or any other method approved by the Engineer. All such costs <br /> associated with this shall be included in the unit cost of storm sewer system . <br /> Should any constructed item be damaged due to erosion or sedimentation , the <br /> Contractor shall repair or replace the item with no additional compensation . All new <br /> and existing (where called for) storm sewer pipes shall be clean and free from silt <br /> prior to final acceptance . <br /> E . Permits to be Obtained by Contractor: <br /> > . The OWNER has obtained certain permits for this project and they are listed <br /> in paragraph SC-6 .08 of the Supplementary Conditions. Per paragraph SC- <br /> 6 . 08 . 0 of the Supplementary Conditions , the CONTRACTOR shall apply for, <br /> obtain , and pay for all other required permits and licenses . This may <br /> include but not be limited to: <br /> a . Long-term or short-term dewatering permit as required by the <br /> St. Johns River Water Management District (SJRWMD ) . <br /> Contact SJRWMD at (321 ) 984-4940 to determine which <br /> permit is required and the associated statutory requirements ; <br /> b . Florida Department of Environmental Protection ( FDEP) <br /> "Notice of Intent to Use Generic Permit for Stormwater <br /> Discharge From Construction Activities That Disturb Five or <br /> More Acres of Land " permit application form . Contact FDEP <br /> at (407) 894-7555 or (850 ) 921 -9904 ; and <br /> GENERAL PROVISIONS <br /> TP-4 <br /> C:\Documents and Settingslteresaa\Local Settings\Temporary Internet Files\OLKQOVISION 2 - Technical Provisions (Oslo Road <br /> Phase I ).doc <br />