Laserfiche WebLink
C . U . S . Environmental Protection Agency ( EPA) "Notice of Intent <br /> (NOI ) for Storm Water Discharges Associated With <br /> Construction Activity Under a NPDES General Permit. " <br /> 2. Provide copies of all permits to the OWNER and ENGINEER and comply <br /> with all conditions contained in all permits at no extra cost to the OWNER. If <br /> there is a conflict between any permit requirement and these Specifications , <br /> the more stringent specification or requirement shall govern . <br /> F . Non-Compliance : Should the Owner or Engineer determine that erosion control <br /> within the project is not being maintained in accordance with the FDOT indexes <br /> and specifications , the contractor shall have until the end of the working day in <br /> which notification is given to take corrective action . Should the contractor fail to <br /> make such modification the Owner shall have the option to fine the contractor $400 <br /> per day until remedied . <br /> G . Compensation : All payment for the above items shall be made under Item <br /> Item No . 104- 10- 1 — Hay or Straw Bale ( 1819x1813x36") — Each <br /> Item No . 104- 11 — Turbidity Barrier Floating — Linear Foot <br /> Item No . 104- 12 — Turbidity Barrier Staked — Linear Foot <br /> Item No . 104- 13- 1 — Silt Fence Staked (Type 111 ) — Linear Foot <br /> Item No . 104- 16 — Rock Bags — Each <br /> SECTION 00110 CLEARING AND GRUBBING <br /> A . Payment for Clearing and Grubbing shall include compensation for: the removal <br /> and disposal of asphaltic concrete and existing concrete pavement , concrete, <br /> sidewalks , curbing , abandoned utilities (including pipes , cables, conduit and <br /> structures) , existing walls , riprap , various types of fences , base material , trimming <br /> of trees and shrubs , drainage structures , pipe, backfilling the removal excavations , <br /> plus all other items necessary to be removed to construct the project . All non- <br /> salvageable materials removed shall remain property of the Contractor unless <br /> otherwise directed by the Engineer or Owner (See Article SC-W ). All unwanted <br /> materials shall be removed and suitably disposed of by the Contractor outside the <br /> project limits (see Article SC-W). Any salvage value received from the removed <br /> materials shall be reflected in the Contractor's proposal . <br /> B . Clear and grub within the entire limits of the right-of-way except in specific areas <br /> designated by the Engineer to remain for aesthetic purposes . <br /> C . Existing and temporary asphaltic pavement and excess subsoil shall be disposed <br /> of outside the project by the Contractor, at a location and in a manner approved by <br /> the Engineer. <br /> D . Removal of existing pavement includes all removal and disposal of the asphalt <br /> within the limit shown on the plans . <br /> E . Payment shall be made under: <br /> GENERAL PROVISIONS <br /> TP-5 <br /> CADocuments and Settings\teresaa\Local Settings\Temporary Internet Files\OLKF3\DIVISION 2 - Technical Provisions (Oslo Road <br /> Phase 1).doc <br />