My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . Subcontractors . <br /> 3 . Other concerned parties . <br /> 4 . OWNER (two copies) . <br /> 5. ENGINEER <br /> B . In the cover letter, instruct recipients to report promptly to the <br /> CONTRACTOR, in writing , any problems anticipated by the projections <br /> shown in the schedules . <br /> SECTION 00120 EXCAVATION AND EMBANKMENT <br /> A. Earthwork, including earthwork for drives outside the right-of-way limits , shall be <br /> paid for as embankment. Cost shall include all work specified in this section and <br /> Section 120 of the Standard Specifications . Such price and payment shall <br /> specifically include all cost of any roadway, lateral ditch or canal , and final dressing <br /> operations . <br /> B . Earthwork quantities shall be considered as in-place material with no shrinkage or <br /> expansion factors . <br /> C . Subsoil Excavation - Any excavation below the proposed bottom elevation of the <br /> select fill , isolated swale bottom locations , isolated locations for pipe installations <br /> and as approved by the engineer shall be paid for as subsoil excavation . <br /> Approximately 2 . 0 ft of subsoil excavation is required in sublateral canals . Cost of <br /> replacement embankment shall be included in cost of subsoil excavation . <br /> Contractor to coordinate with county representative prior to any subsoil excavation . <br /> D . Embankment - General Requirements for Embankment Materials : The following is <br /> added after the first paragraph of Subarticle 120-7 . 2 : <br /> Roadway Design Standard Index No. 505 , Embankment Utilization Details is <br /> modified by the addition of the following : <br /> Any stratum or stockpile or soil which contains obvious pockets of highly organic <br /> material may be designated as muck or unsuitable for construction of subgrade by <br /> the Owner. <br /> Backfill material containing more than 2 . 0% by weight of organic material , as <br /> determined by FM 1 -T 267 and by averaging the test results for three randomly <br /> selected samples from each stratum or stockpile of a particular material , shall not <br /> be used in construction of the reinforced volume . If an individual test value of the <br /> three samples exceeds 3 .0% , the stratum or stockpile will not be suitable for <br /> construction of the reinforced volume . <br /> No A-8 material permitted in embankment. <br /> E . Payment shall be made under: <br /> GENERAL PROVISIONS <br /> TP-7 <br /> O:\Documents and Settings\teresaa\Local Settings\Temporary Internet Files\OLKF3\DIVISION 2 - Technical Provisions (Oslo Road <br /> Phase I ).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.