My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No . 120- 1 — Excavation Regular — Per Cubic Yard <br /> Item No . 120-4 - Subsoil Excavation - Per Cubic Yard <br /> Item No . 120-6 - Embankment - Per Cubic Yard <br /> SECTION 00160 STABILIZING <br /> A . Sub Article 160-5 . 1 is modified by the addition of the following : <br /> "The stabilization thickness indicated on plans shall be considered a minimum <br /> thickness . Thickness will vary to conform to the lines, and grades shown in the <br /> plans." Minimum L . B . R. = 40 - No under-tolerance . <br /> B . Payment shall be made under: <br /> Item No . 160-4 - Type B Stabilization ( 12" ) - Per Square Yard <br /> SECTION 00285 OPTIONAL BASE COURSE <br /> A. Sub Article 285-4 is modified by the addition of the following : <br /> Base material , thickness and requirements are described in the construction plans. <br /> Only one type of alternate base material shall be used . No additional payment will <br /> be made for base thickness in excess of the specified thickness <br /> B . Payment shall be made under: <br /> Item No . 285-707 - Base Group 7 - Per Square Yard <br /> SECTION 286 TURNOUT CONSTRUCTION <br /> Sub Article 286-6 is modified by the addition of the following : <br /> The cost of any bituminous material used in hot bituminous mix, form work , prime coat or <br /> tack coat, or any incidental labor or material shall not be paid for separately . <br /> Payment shall be made under: <br /> Item No . 286- 1 - 1 - Turnout Construction (Asphalt) - Square Yard <br /> GENERAL PROVISIONS <br /> TP-8 <br /> CADocuments and Settings\teresaa\Local Settings\Temporary Internet Files\OLKF3\DIVISION 2 - Technical Provisions (Oslo Road <br /> Phase I).doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.