My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00334 SUPERPAVE ASPHALTIC CONCRETE <br /> A . Subarticle 334- 10 is modified by the addition of the following : <br /> No additional payment will be made for tonage in excess of the specified in-place <br /> density and tonnage. <br /> B . Payment shall be made under: <br /> Item No . 334- 1 - 13 — Superpave Asphaltic Concrete — Ton . <br /> SECTION 00425 INLETS. MANHOLES AND JUNCTION BOXES <br /> A. MODIFICATION OF EXISTING STRUCTURES : Price shall include all work <br /> associated with modifying the existing drainage structure (s ) as depicted in the <br /> Plans and in accordance with Section 425 . <br /> Payment shall be made under: <br /> Item No . 425-72 - Modify Inlet - Per Each <br /> B . Drainage structures indicated to be utility conflict manholes shall be constructed in <br /> accordance with Indian River County Department of Utility Services Water and <br /> Wastewater Utility Standards. Cost of such structures shall include all labor and <br /> material necessary. <br /> Payment shall be made under: <br /> Item No . 425- 1 -459 — Inlets , Curb (Type J -5) (Conflict) - Per Each <br /> Item No. 425-2-74 — Manholes (type J-7) (Conflict) - Per Each <br /> Item No . 425-2-94 — Manholes (Type J -8) (Conflict) - Per Each <br /> C . MANHOLES : Price shall include all work associated with constructing and <br /> installing manholes and covers . The covers shall have raised letters , cast in the <br /> cover stating "STORM SEWER" . <br /> SECTION 00430 PIPE CULVERTS AND STORM SEWERS <br /> A. CONCRETE PIPE CULVERT (CLASS III ) : Concrete pipe culvert shall be Class III <br /> and constructed in accordance with ASTM Designation C-76 , Class III , Wall B . <br /> Any select bedding needed to stabilize pipe to be #57 or #4 rock. Select bedding <br /> will be included in the cost of the pipe . Minimum bedding depth to be 18" and <br /> GENERAL PROVISIONS <br /> TP-9 <br /> C:\Documents and Settings\teresaa\Local Settings\Temporary Internet Files\OLKF3\DIVISION 2 - Technical Provisions (Oslo Road <br /> Phase I ).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.