My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
minimum width to be diameter of pipe. Cost of removal of unsuitable material and <br /> replacement with suitable material beneath 18" bedding shall be paid for as subsoil <br /> excavation item no . 120-4 . <br /> The work under this section shall include all materials , excavation , backfilling , <br /> tamping and disposal of surplus material . All required sheeting is to be included in <br /> the cost of item no . 455- 133-2 . Such price and payment shall be full compensation <br /> for all work in this section . <br /> B . CONCRETE PIPE JOINTS : Subarticle 430-7 . 1 . 1 is modified by the addition of the <br /> following : In addition to the rubber gaskets all round and elliptical concrete pipe <br /> shall have wrapped filter fabric jacket joints . The joint between the pipe and the <br /> structure shall also have a filter fabric jacket. These joints shall conform to INDEX <br /> 280 and have a minimum wrapping width of 1 foot on both sides of the exposed <br /> joint . The fabric must be long enough to overlap the outer circumference of the <br /> pipe joint by a minimum of 1 foot. Metal strapping will be used on both sides of the <br /> circumference of the pipe joint to secure the fabric. Other methods which will <br /> secure the fabric against the wall until the backfill is compacted will be considered <br /> for approval by the Engineer. The filter fabric shall be in accordance with Section <br /> 985 , and/or as modified by these special provision , for subsurface drainage . <br /> Payment shall be made under the unit price for concrete pipe . <br /> C . PIPE CULVERTS AND STORM SEWERS : Subarticle 430- 12 . 1 . The text is <br /> deleted and the following substituted : <br /> "The quantities of pipe culvert to be paid for under this Section shall be the plan <br /> quantity in feet of concrete Pipe Culvert, Corrugated Aluminum Pipe Culvert and <br /> High Density Polyethylene Pipe Culvert subject to the provisions of 9-3 . 2 . Any <br /> additions or deletions thereto, as authorized by the Engineer, shall be determined <br /> by plan dimensions, final measurement, or any combination thereof, as measured <br /> along the centerline of the completed and accepted pipe." <br /> Pipe that has been patched significantly prior to delivery shall be grounds for <br /> rejection of pipe. <br /> Lifting holes on pipe culverts shall be grounds for rejection of pipe . ASTM <br /> Specification C-76-85A and AASTM Specification M170-89 are modified by the <br /> following : <br /> Significant patching of pipe prior to delivery shall be grounds for rejection of pipe . <br /> The exposure of the ends of the longitudinal stirrups or spacers that have been <br /> used to position the cages during the placement of the concrete may be a cause <br /> for rejection by the Project Engineer. <br /> During construction , the Contractor is to maintain the storm sewer void of any <br /> silting material . Prior to final acceptance the Contractor or Engineer shall inspect <br /> and certify that the storm sewer is free of any construction material or debris and <br /> operates in a functional manner. Contractor shall remove silt and other material <br /> GENERAL PROVISIONS <br /> TP- 10 <br /> C:\Docurnents and Settings\teresaa\Local Settings\Temporary Internet Files\OLKF3\DIVISION 2 - Technical Provisions (Oslo Road <br /> Phase I ).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.