My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00575 SODDING <br /> A. Description : Sod for the project shall be of the variety that is common to the area <br /> and of a variety approved by the Engineer. This work shall also include mowing in <br /> accordance with Section 104-7 . 2 , to be mowed at 6" height with a mulching <br /> mower. <br /> B . Work Included : Scope of Work: The work specified in this section consists of the <br /> establishing of a stand of grass , within the project, right-of-way, easements , and <br /> other areas indicated on the Drawings , by furnishing and placing grass sod . Also <br /> included are fertilizing , watering and maintenance as required to assure a healthy <br /> stand of grass . Two applications of fertilizer will be required with the initial <br /> application being fertilizer and the second application being "weed and feed" . <br /> C . Guarantee : All sodded areas shall be guaranteed for three months after date of <br /> final acceptance. <br /> Replacement of Defective Sod : Any dead sod or sod showing ( less than 95 % of a <br /> square) indication of probable non survival or lack of health and vigor, or which do <br /> not exhibit the characteristics to meet specifications , shall be replaced within two <br /> weeks of notice from Owner or Engineer. All replacement sod shall be <br /> furnished/installed at no additional cost to the Owner and shall be guaranteed for <br /> three months . All replacement shall meet original specifications . <br /> The Contractor shall notify the Owner and Engineer ten days prior to the end of the <br /> guarantee period and such guarantee shall be extended until notification is <br /> received . <br /> At the end of the guarantee period , all sod that is dead or in unsatisfactory growth <br /> shall be replaced within two weeks . <br /> D . Fertilizer: Commercial fertilizers shall comply with the state fertilizer laws . <br /> The numerical designations for fertilizer indicate the minimum percentages <br /> (respectively) of ( 1 ) total nitrogen , (2 ) available phosphoric acid and (3 ) <br /> water-soluble potash contained in the fertilizer. <br /> The chemical designation of the fertilizer shall be 16-4-8 . Fertilizer shall include <br /> iron , minor nutrients and trace elements . At least 50 percent of the nitrogen shall <br /> be derived from organic sources . At least 50 percent of the phosphoric acid shall <br /> be from normal super phosphate or an equivalent source which will provide a <br /> minimum of two units of sulfur. The amount of sulfur shall be indicated on the <br /> quantitative analysis card attached to each bag or other container. <br /> Contractor shall ensure 1 pound of nitrogen per 1 , 000 square feet. <br /> E . Water for Grassing : Contractor shall provide the water used in the sodding <br /> operations as necessary to meet the requirements of Article 570-5 and 2 . 34 . 13 . <br /> F . Preparation of Ground : The area over which the sod is to be placed shall be <br /> scarified or loosened to a depth and then raked smooth and free from debris . <br /> Where the soil is sufficiently loose and clean , the Owner, at his discretion , may <br /> authorize the elimination of ground preparation . <br /> GENERAL PROVISIONS <br /> TP- 12 <br /> CADocuments and Settings\teresaa\Local Settings\Temporary Internet Files\OLKF3\DIVISION 2 - Technical Provisions (Oslo Road <br /> Phase 1 ).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.