My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost of valve nut extenders shall be included in cost of valve box <br /> adjustments where needed . <br /> E . Disinfecting Potable Water Pipelines <br /> Before being placed in service , all potable water pipelines shall be <br /> chlorinated in accordance with the latest edition of AWWA C-651 , <br /> "Standard Procedure for Disinfecting Water Mains" , except that the use of <br /> tablets is strictly prohibited . The procedure shall be approved by the <br /> Engineer. The location of the chlorination and sampling points will be as <br /> specified by the Florida Department of Environmental Protection , Water <br /> Distribution System Permit. Taps for chlorination and sampling shall be <br /> uncovered and backfilled by the Contractor, as required . <br /> SECTION 02670 FLUSHING, TESTINC4 AND DISINFECTION <br /> PART 1 - GENERAL <br /> 1 . 01 WORK INCLUDED <br /> A. Flushing , Pressure Testing , and Disinfection of all piping systems . <br /> B . Contractor shall furnish all necessary pumps , hoses , piping , fittings , meters , <br /> gauges , chemicals and labor to conduct specified testing . <br /> C . Testing shall be repeated at the Contractor' s expense until satisfactory results <br /> are achieved . <br /> D . Refer the specific chemical system specification section for additional flushing <br /> and testing procedures. <br /> 1 . 02 RELATED REQUIREMENTS SPECIFIED ELSEWHERE <br /> A . Section 1000 — Water and Sewer Utilities <br /> 1 . 03 REFERENCES <br /> A. ANSI/AWWA C651 - Standard for Disinfecting Water Mains. <br /> 1 . 04 SUBMITTALS <br /> A . Test Reports : Indicate results comparative to specified requirements . <br /> Submit two (2 ) copies of test results to Engineer in accordance with <br /> Submittal specifications . <br /> 1 . 05 QUALITY ASSURANCE <br /> A. Perform Work in accordance with ANSI/AWWA C651 . <br /> 1 . 06 REGULATORY REQUIREMENTS <br /> A. Conform to applicable Florida DEP requirements for performing the work of <br /> this Section . <br /> B . Work shall conform to Indian River County Standards . <br /> GENERAL PROVISIONS <br /> TP-16 <br /> C:\Documents and Sellings\teresaa\Local Settings\Temporary Internet Files\OLKF30IVI SION 2 - Technical Provisions (Oslo Road <br /> Phase I).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.