My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2 - PRODUCTS <br /> 2 . 01 DISINFECTION CHEMICALS <br /> A. Chemicals : The disinfecting agent shall be sodium hypochlorite solution <br /> ANSI/AWWA B303 or liquid chlorine ANSI/AWWA B301 . Dry hypochlorite , <br /> similar to " HTH" or equal may also be used as the disinfecting agent . <br /> Bleach or Clorox is not acceptable . <br /> PART 3 - EXECUTION <br /> 3 .01 EXAMINATION <br /> A. Verify that piping systems have been cleaned , inspected , and tested . <br /> B . Coordinate scheduling of flushing , pressure testing , and disinfection <br /> activities with tie-ins , certifications , and sequence of construction . <br /> 3 . 02 FLUSHING AND PRESSURE TESTING - PIPING <br /> A . The Contractor shall furnish and install suitable temporary testing plugs or <br /> caps for the water lines , all necessary pressure pumps , hose , pipe <br /> connections , meters, gauges and other similar equipment, and all labor <br /> required , all without additional compensation for conducting pressure and <br /> leakage tests and flushing of the piping . Flushing and pressure testing shall <br /> be conducted in the following order. <br /> B . After all piping lines have been installed and before pressure testing , each run <br /> of pipe shall be thoroughly flushed so as to remove all debris and foreign <br /> matter from the piping and equipment. Clean and flush all piping using <br /> potable water. Sufficient flushing water and pigging shall be introduced into <br /> the piping to produce a discharge that is clear with no evidence of silt or <br /> foreign matter is visible . Contractor to provide means of discharging and <br /> disposing of water at Contractor's expense. <br /> C . Pressure testing ductile iron piping systems : <br /> 1 . The test pressure for the water piping , irrigation quality water piping , <br /> and force main piping systems constructed of ductile iron shall be <br /> 150 psi and this pressure shall be maintained for a period of not less <br /> than two hours . Tests shall be made between valves and as far as <br /> practicable and as approved by the Engineer. Potable water from the <br /> distribution system shall be used . Pressure shall not vary more than <br /> five (5) psi for piping during the test periods or as approved by the <br /> Engineer. Allowable leakage shall be computed on the basis of <br /> AWWA C-600 . <br /> 2 . All leaks evident at the surface shall be uncovered and repaired <br /> regardless of the total leakage as indicated by the test, and all pipes , <br /> valves and fittings and other materials found defective under the test <br /> shall be removed and replaced at the Contractor's expense . Tests <br /> GENERAL PROVISIONS <br /> TP- 17 <br /> C:\Documents and SettingsVeresaa\Local Settings\Temporary Internet Files\OLKF3\DIVISION 2 - Technical Provisions (Oslo Road <br /> Phase I).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.