shall be repeated until leakage has been reduced below the <br /> allowable amount . <br /> 3 . In the judgment of the Engineer, should it not be practical to follow <br /> the foregoing procedures exactly for any reason , modifications in the <br /> procedure shall be made as approved by the Engineer. In any event, <br /> the Contractor shall be responsible for the ultimate water tightness of <br /> the piping within the preceding requirements . <br /> 3 . 03 DISINFECTION <br /> A. The Contractor shall furnish and install suitable temporary connections to the <br /> piping , all necessary pressure pumps , hose , pipe connections , meters , <br /> gauges and other similar equipment , and all labor required , all without <br /> additional compensation for the disinfection of all required piping systems . <br /> Disinfection shall be conducted on the following systems : <br /> 1 . Water main piping and valves . <br /> B . Conform to AWWA Standards and as modified herein . <br /> C . Maintain disinfectant for a minimum of 8 hours in such a manner that the <br /> entire system will be filled with water containing a minimum chlorine <br /> concentration of 50 ppm at any point. <br /> D . After the disinfecting agents have been permitted to remain for the specified <br /> contact periods , the water lines , and valves shall be thoroughly flushed with <br /> water until the residual chlorine tests are less than 2 PPM in each instance. <br /> The determination of the amount of residual chlorine in the system shall be <br /> made at such points and in accord with standard tests by means of a <br /> standard orthotolodine test set. <br /> 3 .04 BACTERIOLOGICAL SAMPLING <br /> A. It shall be the responsibility of the Contractor under this contract to perform the <br /> bacteriological testing required by the Florida Department of Environmental <br /> Protection and Indian River County to obtain clearance of the water main <br /> piping . The Contractor shall be responsible to disinfect and repeat testing <br /> as needed until clearance is obtained for all required plant systems . The <br /> Contractor shall be responsible to pay for additional water needed if the <br /> bacteriological testing must be repeated for the clearance of the ground <br /> storage tank. <br /> B . The piping systems require two (2 ) consecutive daily samples taken from the <br /> locations called out on the plans or as determined by the Engineer. The <br /> samples shall be taken at all the respective sample point locations . <br /> C . Sampling must be coordinated with Engineer and other construction activities <br /> so as to minimize re-sampling . <br /> D . Contractor shall submit schedule for bacteriological testing and pressure tests . <br /> E . The Contractor shall incur all costs needed to provide bacteriological <br /> clearance of the piping systems . <br /> GENERAL PROVISIONS <br /> TP-18 <br /> C:%Documents and SettingsVeresaalLocal Settings\Temporary Internet Files\OLKF30IVISION 2 - Technical Provisions (Oslo Road <br /> Phase I ).doc <br />