Work shall be done at the Site prior to the date on which the v4iieh CONTAACTOR .l.d OWINru _e ivel <br /> Contract Times commence to run. requiFed r feh a appefdance-. <br /> Article 5 . <br /> 2 . 05 Before Starting Construction <br /> Paragraph 2.06.A has been deleted and replaced <br /> A. CONTRACTOR 's Review of Contract Documents. with a new paragraph. See the Supplementary <br /> Before undertaking each part of the Work, Conditions. <br /> CONTRACTOR shall carefully study and compare the 2.06 Preconstruction Conference <br /> Contract Documents and check and verify pertinent figures <br /> therein and all applicable field measurements. A. Within 20 days fte_ the C <br /> CONTRACTOR shall promptly report in writing to Pan, but hef Fe " ++',._i. at the Site <br /> ENGINEER any conflict, error, ambiguity, or discrepancy a ten aea by GQT•RR ^.CTOD E^:''INEEn� others er, <br /> which CONTRACTOR may discover and shall obtain a appEopriate mill be hold to establish a wofking <br /> written interpretation or clarification from ENGINEER Lader t^^'"_"^ among the ......ies as to the Work and to <br /> before proceeding with any Work affected thereby; discuss the g_lied-ule^ Fef--ea to in PaFagi:aph 2.05 .B , <br /> however, CONTRACTOR shall not be liable to OWNER pFeeedures `r handling Shop Dra3A* a etheF <br /> or ENGINEER for failure to report any conflict, error, submittals, r_ccessing •^•pphe=tio-W fef Pa�yment, an <br /> ambiguity, or discrepancy in the Contract Documents unless <br /> CONTRACTOR knew or reasonably should have known <br /> thereof. 2 .07 Initial Acceptance of Schedules <br /> B. Preliminary Schedules. Within ten days after the A. Unless otherwise provided in the Contract Docu- <br /> Effective Date of the Agreement (unless otherwise specified ments, at least ten days before submission of the first <br /> in the General Requirements), CONTRACTOR shall Application for Payment a conference attended by CON- <br /> submit to ENGINEER for its timely review: TRACTOR, ENGINEER, and others as appropriate will be <br /> held to review for acceptability to ENGINEER as provided <br /> 1 . a preliminary progress schedule indicat- below the schedules submitted in accordance with <br /> ing the times (numbers of days or dates) for starting paragraph 2.05 .B. CONTRACTOR shall have an <br /> and completing the various stages of the Work, additional ten days to make corrections and adjustments and <br /> including any Milestones specified in the Contract to complete and resubmit the schedules. No progress <br /> Documents; payment shall be made to CONTRACTOR until acceptable <br /> schedules are submitted to ENGINEER. <br /> 2. a preliminary schedule of Shop Drawing <br /> and Sample submittals which will list each required 1 . The progress schedule will be acceptable <br /> submittal and the times for submitting, reviewing, to ENGINEER if it provides an orderly progression <br /> and processing such submittal; and of the Work to completion within any specified <br /> Milestones and the Contract Times. Such accep- <br /> 3 . a preliminary schedule of values for all of tante will not impose on ENGINEER responsibility <br /> the Work which includes quantities and prices of for the progress schedule, for sequencing, schedul- <br /> items which when added together equal the Contract ing, or progress of the Work nor interfere with or <br /> Price and subdivides the Work into component parts relieve CONTRACTOR from CONTRACTOR's <br /> in sufficient detail to serve as the basis for progress full responsibility therefor. <br /> payments during performance of the Work. Such <br /> prices will include an appropriate amount of 2 . CONTRACTOR's schedule of Shop <br /> overhead and profit applicable to each item of Drawing and Sample submittals will be acceptable <br /> Work. to ENGINEER if it provides a workable <br /> arrangement for reviewing and processing the <br /> Paragraph 2.05.0 has been deleted and replaced with a required submittals, <br /> new paragraph. See the Supplementary Conditions. <br /> C. E+4enee et`hisuranee: Before a_. Aferic t the <br /> 3 . CONTRACTOR' s schedule of values <br /> Site is ta-ft ed C01bg- ^.CTOR and O+.`INFE shall @ae4i will be acceptable to ENGINEER as to form and <br /> deliver to the atheF, with ccr:e, to . .h dd 'rt o a �a substance if it provides a reasonable allocation of the <br /> identified in the Supplementary d :,, ��f Contract Price to component arts of the Work. <br /> rr.... .......^� mp P <br /> 00700 - 10 <br />