My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"suitable," "acceptable," "proper," "satisfactory," or <br /> adjectives of like effect or import are used to describe 3 he wa-ds "-e-f ^- --• jai," ---Le- <br /> an action or determination of ENGINEER as to the used :_ <br /> Work, it is intended that such action or determination hall mean to furnish a ll said <br /> will be solely to evaluate, in general, the completed <br /> Work for compliance with the requirements of and €bFmtepdedlisp, <br /> information in the Contract Documents and confor- <br /> mance with the design concept of the completed Project Paragraph DA has been deleted in its entirety. <br /> as a functioning whole as shown or indicated in the 4 . When "famish," "install," per€ertr ," er=pre <br /> Contract Documents (unless there is a specific statement vide" is not lased in comee�ian 3Aith Services, <br /> indicating otherwise). The use of any such term or <br /> adjective shall not be effective to assign to ENGINEER an obligation of CONTRACTOR, 'tprevide" i <br /> any duty or authority to supervise or direct the implied, <br /> performance of the Work or any duty or authority to <br /> undertake responsibility contrary to the provisions of E. Unless stated otherwise in the Contract Docu- <br /> paragraph 9. 10 or any other provision of the Contract ments, words or phrases which have a well-known technical <br /> Documents. or construction industry or trade meaning are used in the <br /> Contract Documents in accordance with such recognized <br /> B. Day meaning. <br /> 1 . The word "day" shall constitute a <br /> calendar day of 24 hours measured from midnight to ARTICLE 2 - PRELIMINARY MATTERS <br /> the next midnight. <br /> C. Defective 2.01 Delivery of Bonds <br /> 1 . The word "defective," when modifying A. When CONTRACTOR delivers the executed <br /> the word "Work," refers to Work that is Agreements to OWNER, CONTRACTOR shall also deliver <br /> unsatisfactory, faulty, or deficient in that it does not to OWNER such Bonds as CONTRACTOR may be <br /> conform to the Contract Documents or does not required to furnish. <br /> meet the requirements of any inspection, reference <br /> standard, test, or approval referred to in the Contract 2.02 Copies of Documents <br /> Documents, or has been damaged prior to <br /> ENGINEER's recommendation of final payment A. OWNER shall furnish to CONTRACTOR up to <br /> (unless responsibility for the protection thereof has ten copies of the Contract Documents. Additional copies <br /> been assumed by OWNER at Substantial will be famished upon request at the cost of reproduction. <br /> Completion in accordance with paragraph 14.04 or <br /> 14.05). 2.03 Commencement of Contract Times, Notice to <br /> Proceed <br /> Paragraphs D.1, 2 and 3 have been deleted and replaced <br /> by new paragraphs. See the Supplementary Conditions. A. The Contract Times will commence to run on the <br /> D. Furnish, Install, Perform, Provide thirtieth day after the Effective Date of the Agreement or, if <br /> a Notice to Proceed is given, on the day indicated in the <br /> 1 . The—rserd "€urrusl when used An Notice to Proceed. A Notice to Proceed may be given at <br /> eamection "ith sencices, -awfials, ^r e:,».r•mem, any time within 30 days after the Effective Date of the <br /> shall mean toSUrr_Fly e:d deliNe is <br /> v Agreement. In no event will the Contract Times commence <br /> materials, eF evipment to the Site (of some other to run later than the sixtieth day after the day of Bid opening <br /> "ei lied kisatien) ready `= use @- installation and or the thirtieth day after the Effective Date of the <br /> Agreement, whichever date is earlier. <br /> 2. The word "install,"-wb _ used i' , ennee- 2-04 Starting the IVork <br /> tion th services, watenals, aF equipment, shall <br /> " r" ' ^" place in `Fial position said A. CONTRACTOR shall start to perform the Work <br /> services, Friaterials, c- c r:::pt:nta " -- on the date when the Contract Times commence to run. No <br /> Feady for intended use <br /> 00700 - 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.