which may be bound in one or more volumes, is contained 45 . Supplier--A manufacturer, fabricator, suppli-
<br /> in the table(s) of contents. er, distributor, materialman, or vendor having a direct
<br /> contract with CONTRACTOR or with any Subcontractor to
<br /> 36. Radioactive Material--Source, special nucle- furnish materials or equipment to be incorporated in the
<br /> ar, or byproduct material as defined by the Atomic Energy Work by CONTRACTOR or any Subcontractor.
<br /> Act of 1954 (42 USC Section 2011 et seq.) as amended
<br /> from time to time. 46. Underground Facilities—All underground
<br /> pipelines, conduits, ducts, cables, wires, manholes, vaults,
<br /> 37. Resident Project Representative--The autho- tanks, tunnels, or other such facilities or attachments, and
<br /> rized representative of ENGINEER who may be assigned to any encasements containing such facilities, including those
<br /> the Site or any part thereof. that convey electricity, gases, steam, liquid petroleum
<br /> products, telephone or other communications, cable
<br /> 38. Samples--Physical examples of materials, television, water, wastewater, storm water, other liquids or
<br /> equipment, or workmanship that are representative of some chemicals, or traffic or other control systems.
<br /> portion of the Work and which establish the standards by
<br /> which such portion of the Work will be judged. 47. Unit Price Work--Work to be paid for on the
<br /> basis of unit prices.
<br /> 39. Shop Drawings--All drawings, diagrams,
<br /> illustrations, schedules, and other data or information which 48 . Work--The entire completed construction or
<br /> are specifically prepared or assembled by or for CON- the various separately identifiable parts thereof required to
<br /> TRACTOR and submitted by CONTRACTOR to illustrate be provided under the Contract Documents. Work includes
<br /> some portion of the Work. and is the result of performing or providing all labor,
<br /> services, and documentation necessary to produce such
<br /> 40. Site—Lands or areas indicated in the Contract construction, and furnishing, installing, and incorporating
<br /> Documents as being famished by OWNER upon which the all materials and equipment into such construction, all as
<br /> Work is to be performed, including rights-of-way and required by the Contract Documents.
<br /> easements for access thereto, and such other lands famished
<br /> by OWNER which are designated for the use of 49. Work Change Directive--A written statement
<br /> CONTRACTOR. to CONTRACTOR issued on or after the Effective Date of
<br /> the Agreement and signed by OWNER and recommended
<br /> 41 . Specifications—That part of the Contract by ENGINEER ordering an addition, deletion, or revision
<br /> Documents consisting of written technical descriptions of in the Work, or responding to differing or unforeseen
<br /> materials, equipment, systems, standards, and workmanship subsurface or physical conditions under which the Work is
<br /> as applied to the Work and certain administrative details to he performed or to emergencies. A Work Change
<br /> applicable thereto. Directive will not change the Contract Price or the Contract
<br /> Times but is evidence that the parties expect that the change
<br /> 42. Subcontractor--An individual or entity having ordered or documented by a Work Change Directive will be
<br /> a direct contract with CONTRACTOR or with any other incorporated in a subsequently issued Change Order
<br /> Subcontractor for the perfomrance of a part of the Work at following negotiations by the parties as to its effect, if any,
<br /> the Site. on the Contract Price or Contract Times.
<br /> 43 . Substantial Completion—The time at which 50. Written Amendment--A written statement
<br /> the Work (or a specified part thereof) has progressed to the modifying the Contract Documents, signed by OWNER and
<br /> point where, in the opinion of ENGINEER, the Work (or a CONTRACTOR on or after the Effective Date of the
<br /> specified part thereof) is sufficiently complete, in Agreement and normally dealing with the nonengineering or
<br /> accordance with the Contract Documents, so that the Work nontechnical rather than strictly construction-related aspects
<br /> (or a specified part thereof) can be utilized for the purposes of the Contract Documents,
<br /> for which it is intended. The terms "substantially complete"
<br /> and "substantially completed" as applied to all or part of the 1 .02 Terminology
<br /> Work refer to Substantial Completion thereof.
<br /> A. Intent of Certain Terms or Adjectives
<br /> 44. Supplementary Conditions--That pan of the
<br /> Contract Documents which amends or supplements these L Whenever in the Contract Documents the
<br /> General Conditions. terms "as allowed," "as approved," or terms of like
<br /> effect or import are used, or the adjectives "reasonable,"
<br /> 00700 - 8
<br />
|